My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-136
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 4:15:01 PM
Creation date
9/30/2015 6:35:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/10/2003
Control Number
2003-136
Agenda Item Number
11.G.1.
Entity Name
State of Florida Department of Environmental Protection
Subject
Grant Awards - DEP Agreement No. 0061
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3270
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department Contract Manager within one month of the review, and a copy shall be maintained with the <br /> permanent project records. <br /> 2 . Ongoing: Planning reviews as described in 1 above shall occur annually. <br /> C. QUALITY SYSTEMS AUDrrs — The Contractor and all subcontractors shall ensure that the required laboratory and <br /> field quality system and management systems audits are performed, and documented in the organization's records. <br /> D . STATEMENTS OF USABILITY — As a part of the audit process and the final report, the Contractor shall provide <br /> statements about data usability relative to the Project Data Quality Objectives and Data Quality Indicators. <br /> 6. PLANNING DOCUMENTS <br /> A. A Quality Assurance Project Plan (QAPP) shall be submitted to the Department Project Manager for review and <br /> approval. The plan shall be consistent with the EPA Document EPA-QA/R-5 , EPA Requirements for Quality <br /> Assurance Project Plans, dated March 2001 . Failure to submit the required QAPP within six months of the <br /> initiation of sampling activities shall result in suspension of the Contract until the document has been submitted to <br /> DEP . <br /> B. The Contractor and affected subcontractors have three (3) opportunities to submit their QA Plan documents to the <br /> Department for approval . If any Plan fails the approval process three (3) times, the Department may terminate the <br /> Contract in its entirety. Failure to provide acceptable QA Plans as required will result in suspension or termination <br /> of this Contract. <br /> C. The Department Contract Number shall appear on the title page of the submitted QAPP. Within forty-five (45) <br /> days of receipt of properly identified documents by the DEP, the Department shall review and either approve the <br /> QAPP, or provide comments to the Contractor and affected subcontractors as to why the Plan is not approved. If <br /> further revisions are needed, the Contractor shall then have fifteen ( 15) days from the receipt of such comments to <br /> respond. The Department shall respond to all revisions within 30 days of receipt. <br /> D. If QA Plan review is delayed, through no fault of the Contractor, beyond sixty (60) days after the Plan is received <br /> by the Department, the Contractor shall have the option, after the Plan is approved, of requesting and receiving an <br /> extension in the term of the Contract for a time period not to exceed the period that review was delayed. This <br /> option must be exercised at least sixty (60) days prior to the current termination date of the Contract. <br /> E . Sampling and analysis may not begin until the QAPP has been approved. <br /> F. Once approved, the Contractor shall follow the protocols specified in the approved QAPP including, but not <br /> limited to : <br /> 1 . Ensuring that all stated quality control measures are collected, analyzed and evaluated for acceptability; <br /> 2 . Using only the protocols approved in the QAPP; and <br /> 3 . Using only the equipment approved in the QAPP. <br /> G. If any significant changes such as changes in procedures or test methods, changes in organizations, or changes in <br /> key personnel occur, the Contractor shall submit appropriate amendments to the Department Project Manager for <br /> review and inclusion into the QAPP . Failure to submit the required amendments or to meet any of the above-stated <br /> conditions may result in the decision by the Department Project Manager to suspend or terminate the Contract. <br /> 7, DELIVERABLES <br /> A. The following outlines the expected schedule for the deliverables that are associated with the Quality Assurance <br /> requirements of this contract: <br /> 1 . Copy of DoH ELCP certificate, including the list of test methods and analytes, shall be submitted with the <br /> draft QAPP. <br /> 2 . Copies of performance test results (see 2C of laboratory) shall be submitted with the draft QAPP. <br /> 3 . Non-standard laboratory or field procedures — Prior written approval is required and will be provided upon <br /> submission of the complete packet of information for review. <br /> DEP Agreement No. G0061 , Attachment G, Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.