Laserfiche WebLink
SECTION III - SCOPE OF SERVICES <br /> The ENGINEER agrees to perform professional roadway design, bridge design and related <br /> services in connection with the project as required and set forth in the following: <br /> A. GENERAL <br /> 1 . The ENGINEER will endeavor not to duplicate any previous work done on the project. <br /> After issuance of written authorization to proceed, the ENGINEER shall consult with the <br /> COUNTY to clarify and define the COUNTY' S requirements for the project and review <br /> all available data. <br /> 2 . The ENGINEER will attend conferences with the COUNTY and its representatives upon <br /> reasonable request. <br /> 3 . In order to accomplish the work described under this Agreement in the time frames and <br /> conditions set forth in this Agreement, the ENGINEER will observe the following <br /> requirements : <br /> a. The ENGINEER will complete his work on the project within the time <br /> allowed by maintaining an adequate staff of registered engineers, draftsmen <br /> and other employees on the work at all times. <br /> b. The ENGINEER will design the project in such a manner as to be in <br /> conformance with all applicable federal, state and local laws, and shall <br /> comply with the Florida Department of Transportation ' s Manual on Uniform <br /> Minimum Standards for the Design, Construction, and Maintenance of Streets <br /> and Highways (Green Book), latest edition. <br /> c. The ENGINEER will prepare all necessary sketches and completed <br /> application forms to accompany the COUNTY' S applications for required <br /> federal, state, or local permits. <br /> d. The ENGINEER will cooperate with the COUNTY in order that all phases of <br /> the work may be properly scheduled and coordinated. <br /> e. The ENGINEER will send a complete preliminary set of construction plans to <br /> any city, county, state or federal agency from which a permit or other <br /> approval is required prior to final approval of the design by the Director of the <br /> Public Works Department, and will coordinate the project design with all <br /> applicable agencies. <br /> f. The ENGINEER will contact all known utility companies having installations <br /> in the immediate vicinity of the proposed work and consider relocation of <br /> utilities, if necessary. The ENGINEER will provide the COUNTY with <br /> necessary information relative to required utility adjustments, relocations and <br /> installations and will show all utilities on the final design plans. Design <br /> modifications to existing County utility lines, if necessary, may be negotiated <br /> by a separate agreement with the County Utility Department, or the County <br /> Utilities Department may design modifications with Utility Department Staff <br /> or other consultants. <br /> g. The ENGINEER shall report the status of this project to the Director of the <br /> Public Works Department upon request and hold all drawings, calculations <br /> and related work open to the inspection of the Director or his authorized agent <br /> at any time, upon reasonable request. <br /> 4 . The ENGINEER will furnish copies of the drawings, specifications and contract <br /> documents as required by the COUNTY for materials suppliers, federal, state and local <br /> 3 <br /> A:\BridgeDesign-ProfServicesAgreement-BridgeDesignAssoc.doc <br />