My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-071
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:14:51 AM
Creation date
9/30/2015 6:26:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/18/2003
Control Number
2003-071
Agenda Item Number
11.G.3.
Entity Name
Bridge Design Associates, Inc.
Subject
Agreement for Civil Engineering and Bridge Design Services
Area
5th St. SW over 43rd Ave. ditch
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3193
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agencies from whom approval of the project must be obtained. Upon bidding of the <br /> construction contract, the ENGINEER will furnish to the COUNTY 24" x 36" originals <br /> of the drawings and copies of the specifications for the County to copy for prospective <br /> bidders. Additional copies beyond those identified will be provided at cost. All original <br /> documents, survey notes, field books, tracings, and the like, including all items furnished <br /> to the ENGINEER by the COUNTY pursuant to this Agreement, are and shall remain the <br /> property of the COUNTY. <br /> 5 . The drawings prepared by the ENGINEER will be of sufficient detail to permit the actual <br /> location of the proposed improvements . Negotiation for all land rights shall be <br /> accomplished by the COUNTY, unless the COUNTY requests the ENGINEER to <br /> perform these services in a subsequent work order to the AGREEMENT. In this event, <br /> the ENGINEER shall be compensated for such additional services in accordance with <br /> Section VI of the AGREEMENT. <br /> 6 . The ENGINEER acknowledges that preparation of applicable permits for the <br /> COUNTY ' S submittal through governmental regulatory agencies is included within the <br /> scope of basic compensation for the Agreement. Post-initial submittal coordination with <br /> permitting agencies will be performed under the hourly allowance element of this <br /> agreement. Any additional work required by regulatory agencies pursuant to regulations <br /> established after the date of the Agreement shall be an additional service and the <br /> COUNTY shall compensate the ENGINEER in accordance with SECTION VI- <br /> Additional Work, of this Agreement and in accordance with the fee schedule in this <br /> Agreement, as approved by the County prior to commencement of any work performed. <br /> 7 . If following execution of this Agreement the COUNTY proposes to construct the <br /> improvements in a revised phased manner which requires the preparation of plans or the <br /> need to obtain or modify permits previously obtained, the ENGINEER will be <br /> compensated for this effort in accordance with the approved fee schedule in a subsequent <br /> work order to this Agreement. No such additional work shall be initiated unless <br /> approved by the Indian River County Board of County Commissioners. <br /> 8 . Compensation to the ENGINEER for basic services shall be in accordance with Section <br /> V of this Agreement, as mutually agreed upon by the ENGINEER and COUNTY. <br /> B . Design Survey <br /> The ENGINEER shall provide design survey services necessary to support and facilitate <br /> contemplated design and permitting activities associated with this project. <br /> 1 . Establish a project wide Horizontal Control Network. For each of the three project <br /> locations within the DESIGN LIMITS . <br /> 4 <br /> A:\BridgeDesign-ProfServi=Agreement-BridgeDesignAssoc.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.