Laserfiche WebLink
2 . Establishment of a project wide Vertical Control Network for each of the three project <br /> locations within the DESIGN LMTS . All elevations will be referenced to NGVD 1929 <br /> datum. <br /> 3 . Field establishment and monumentation of survey baselines and all side streets involved. <br /> Baseline stationing will be established at one hundred foot ( 100 ' ) intervals for each <br /> project location within the DESIGN LMTS . The DESIGN LIMITS for each project <br /> location are as follows : <br /> 5t' Street SW over 43 `d Avenue Ditch — The DESIGN LMTS shall extend as is 800 feet <br /> north and 800 feet south of 5d' Street SW on 43 `d Avenue and 800 feet east of 43rd <br /> Avenue on 5d' Street SW. Cross-sections shall be provided at 100-foot intervals . The <br /> cross sections shall extend across the right-of--way and a minimum of 25 feet outside the <br /> right-of-way. This is based on the right-of-way being one hundred twenty feet ( 120 ) in <br /> width for 43 `d Avenue and ninety feet (90 ') in width for 5t' Street SW. <br /> Old Dixie Highway over South Relief Canal — The DESIGN LIMIT shall extend from <br /> 2,700 feet north to 2,700 feet south of South Relief Canal on Old Dixie Highway. Cross <br /> sections shall be provided at 100-foot intervals. The cross sections shall extend across <br /> the right-of--way and a minimum of 25 feet outside the right-of-way. This is based on the <br /> right-of--way being eighty feet (80 ) in width. <br /> 43 `d Avenue over South Relief Canal — The DESIGN LIMITS shall extend from 900 feet <br /> north to 900 feet south of South Relief Canal . Cross sections shall be provided at 100- <br /> foot intervals. The cross sections shall extend across the ultimate right-of--way and a <br /> minimum of 25 feet outside the right-of-way. This is based on the right-of--way being <br /> one hundred twenty feet ( 120 ') in width for 43 `d Avenue. <br /> 4 . Improvements within the DESIGN LIMITS for each location will include above ground <br /> visible improvements such as existing pavement location, curbing, utilities (above <br /> ground), drainage facilities within the right-of-way and twenty feet (20 ' ) on each side of <br /> the right-of-way, sidewalks, fences, signage and guardrails. <br /> 5 . Final output will be in the form of hard copy mylar mapping along with digital <br /> AutoCAD, release 2000i DWG files. All mapping will conform to the United States <br /> Geological Survey ' s, "National Map Accuracy Standards, " dated 1968 . <br /> 6 . Research and analysis of existing right-of-way information (to include Abstracts or Title <br /> Searches as provided by COUNTY), field location of existing right-of-way <br /> monumentation and determination of the location and extent of existing right-of-way in <br /> the vicinity of the three bridge replacement projects. <br /> 5 <br /> A:\BridgeDesign-ProfServicesAgreement-BridgeDesignAssoc.doc <br />