Laserfiche WebLink
SECTION 01 <br /> 025 <br /> MEASUREMENT AND PAYMENT <br /> PART 1 — GENERAL <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted <br /> in accordance with the Contract Documents . No separate payment will be <br /> made for excavation , trenching dewatering , backfilling , leakage tests , <br /> surveying , density tests , or other incidental items of work not shown in the <br /> Agreement . <br /> 1 . 02 EQUIPMENT AND MATERIALS IN STORAGE <br /> Partial payment for materials and equipment in <br /> proper storage at the site of <br /> the work or other approved storage site will be made for those items for which <br /> the Contractor has submitted paid invoices to the Engineer. The partial <br /> payment for stored materials will be 50 % of the value of materials and <br /> equipment, based on receipted (paid ) bills , furnished but not incorporated in <br /> the work , as determined by Engineer. <br /> 1 . 03 MEASUREMENT <br /> A . Mobilization : Measurement shall be on a lump sum basis , and shall be <br /> limited to the following maximum amounts : <br /> ORIGINAL CONTRACT AMOUNT ($ ) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 100 , 000 31000 <br /> 1001000 500 , 000 151000 <br /> 500 , 000 19000 , 000 30 , 000 <br /> 110009000 2 , 0001000 60 , 000 <br /> 290007000 390007000 909000 <br /> 39000 , 000 490007000 120 , 000 <br /> 4 , 000 , 000 51000 , 000 1257000 <br /> 51000 , 000 61000 , 000 150 , 000 <br /> 69000 , 000 770007000 175 , 000 <br /> 71000 , 000 10 , 0009000 2007000 <br /> 10 , 000 , 000 2507000 <br /> Should the lump sum price bid for the item Mobilization exceed the maximum <br /> permissible amount for this item , as specified herein , the bid price will be <br /> reduced to the maximum permissible amount , and the reduced price will be <br /> used in correctly determining the total price for comparison of bids received . <br /> The cost of video taping the pre-construction condition shall be included in <br /> the lump-sum cost of mobilization . <br /> i <br /> 01025- 1 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North <br /> County RO\BID DOCUMENTS\01025 Measurement and Payment. doc <br />