My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Pipe : Pipe ( DIP & HDPE ) will be measured alongthe centerline of the pipe <br /> Pp <br /> installed . No deduction will be made for the length of valves and fittings <br /> installed in the line . Where the measurement terminates at a valve , bend , <br /> tee , or other fitting , the centerline of the valve or fitting shall be the point of <br /> termination . All required pipe lining , coating , encasement material , <br /> restraining devices , bends and thrust blocks shall be included in the cost of <br /> the pipe . <br /> C . Fittings : Measurement of cast iron and ductile iron fittings shall be on the <br /> basis of weight . The weights used to determine the quantity installed shall be <br /> the weights of the appropriate fittings as listed in the supplier's invoice or <br /> catalog . When mechanical joint fittings are required , the weight of the gland <br /> bolts and gaskets shall not be added to the listed weight of the fittings . <br /> Where flanged fittings are furnished , the weight of the bolts and gaskets shall <br /> not be included . <br /> D . Fabric Formed Rip Rap : Furnish all material , equipment, labor and perform all <br /> operations for placing fabric formed rip rap per plans and specifications <br /> herein . <br /> E . Clearing , Grubbing , Removal of Muck , Debris and Disposal at landfill : Cut <br /> and remove all timber, trees , stumps , brush , shrubs , roots , grass , weeds , <br /> rubbish muck , debris , spoil and any other objectionable material resting on or <br /> protruding through the surface of the ground . Grub and remove all stumps , <br /> roots in excess of 1 - 1 /2-in in diameter, matted roots , brush , timber, logs , <br /> concrete rubble and other debris encountered to a depth of 18- in below <br /> original grade . Refill all grubbing holes and depressions excavated below the <br /> original ground surface with suitable materials . Compact with a vibratory <br /> compactor. Maximum of 8 inch vertical lifts and 95 % compaction between <br /> lifts . <br /> F . Grassing : Measurement of grassing (seed or sod ) shall be computed using <br /> the linear feet, as measured along the area disturbed and restored as a result <br /> of Contractor's operations . The entire width of the disturbed area shall be <br /> grassed . Payment shall include all necessary grading , soil preparation , <br /> seeding , sodding , fertilizer, mulch , and irrigation <br /> G . Record Drawings : Contractor will provide Indian River County Department of <br /> Utility Service As- Built drawings in AutoCadd format (version 2000 or later) , <br /> which includes location reference in state plane coordinates . <br /> H . Indian River Force Account : Unit Price $25 , 000 . 00 contingency . <br /> 1 . 04 . PAYMENT <br /> Payment will be made at the respective contract unit and/or lump sum price <br /> for each item shown in the Agreement, installed and accepted , which price <br /> and payment shall constitute full compensation for furnishing all materials and <br /> performing all work in connection therewith and incidental thereto . <br /> RESTORATION OF DAMAGED SURFACES , STRUCTURES AND PROPERTY <br /> 01025-2 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North <br /> County RO\BID DOCUMENTS\01025 Measurement and Payment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.