Laserfiche WebLink
SECTION 01060 <br /> REGULATORY REQUIREMENTS AND NOTIFICATION <br /> PART 1 -- GENERAL <br /> 1 .01 PERMITS REQUIRED <br /> A. Indian River Farms Water Control District : The general permit from the <br /> Indian River farms Water Control District ( IRFWCD ) for the project is being <br /> obtained by IRCDUS . <br /> B . INDIAN RIVER COUNTY: The Contractor, along with the Utilities <br /> Department, must obtain right-of--way permit(s) from the Indian River <br /> County Public Works Department prior to initiating construction . It typically <br /> requires three weeks processing time to receive a right-of-way permit. <br /> There is no processing fee for the permit. One set of construction plans <br /> must be submitted along with a permit application to the Indian River <br /> County Engineering Division . Some of the conditions of the County right-of- <br /> way permits are as follows : <br /> 1 . Applicant shall not begin construction of any kind in the County <br /> right-of-way prior to application and issuance of a valid permit by <br /> the Indian River County Engineering Division . <br /> 2 . Any area disturbed in the County right-of-way must be restored by <br /> applicant to a condition equal to or better than existing just prior to <br /> construction , including but not limited to compaction , grading , <br /> paving , seeding and mulching , sodding , etc. , as the case may be . <br /> The quality of construction , materials , and workmanship shall be in <br /> accordance with County standards . All disturbed areas shall be <br /> restored within 48 hours after excavation . <br /> 3 . Applicant shall notify the Indian River County Engineering Division <br /> at least 48 hours prior to the placement of concrete , paving of <br /> asphalt , installation of culverts , or backfilling of trenches , so that the <br /> Indian River County Engineering Division may inspect installations <br /> as necessary. Applicant shall further notify the Indian River County <br /> Engineering Division in writing of its request for final inspection and <br /> approval at the completion of the permitted activity. <br /> 4 . The applicant shall assume responsibility for all maintenance , <br /> replacement , or removal of any right-of-way improvement <br /> authorized by this permit; and applicant further agrees by <br /> acceptance of this permit to indemnify and save harmless the <br /> County, its officers , employees , or agents , from any damages , <br /> claims , causes of action , or losses , whether for personal injury , loss <br /> of life or property damage , arising from the actions or omissions of <br /> 1060 - 1 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01060 Regulatory Requirements and Notification .doc <br />