My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01060 <br /> REGULATORY REQUIREMENTS AND NOTIFICATION <br /> PART 1 -- GENERAL <br /> 1 .01 PERMITS REQUIRED <br /> A. Indian River Farms Water Control District : The general permit from the <br /> Indian River farms Water Control District ( IRFWCD ) for the project is being <br /> obtained by IRCDUS . <br /> B . INDIAN RIVER COUNTY: The Contractor, along with the Utilities <br /> Department, must obtain right-of--way permit(s) from the Indian River <br /> County Public Works Department prior to initiating construction . It typically <br /> requires three weeks processing time to receive a right-of-way permit. <br /> There is no processing fee for the permit. One set of construction plans <br /> must be submitted along with a permit application to the Indian River <br /> County Engineering Division . Some of the conditions of the County right-of- <br /> way permits are as follows : <br /> 1 . Applicant shall not begin construction of any kind in the County <br /> right-of-way prior to application and issuance of a valid permit by <br /> the Indian River County Engineering Division . <br /> 2 . Any area disturbed in the County right-of-way must be restored by <br /> applicant to a condition equal to or better than existing just prior to <br /> construction , including but not limited to compaction , grading , <br /> paving , seeding and mulching , sodding , etc. , as the case may be . <br /> The quality of construction , materials , and workmanship shall be in <br /> accordance with County standards . All disturbed areas shall be <br /> restored within 48 hours after excavation . <br /> 3 . Applicant shall notify the Indian River County Engineering Division <br /> at least 48 hours prior to the placement of concrete , paving of <br /> asphalt , installation of culverts , or backfilling of trenches , so that the <br /> Indian River County Engineering Division may inspect installations <br /> as necessary. Applicant shall further notify the Indian River County <br /> Engineering Division in writing of its request for final inspection and <br /> approval at the completion of the permitted activity. <br /> 4 . The applicant shall assume responsibility for all maintenance , <br /> replacement , or removal of any right-of-way improvement <br /> authorized by this permit; and applicant further agrees by <br /> acceptance of this permit to indemnify and save harmless the <br /> County, its officers , employees , or agents , from any damages , <br /> claims , causes of action , or losses , whether for personal injury , loss <br /> of life or property damage , arising from the actions or omissions of <br /> 1060 - 1 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01060 Regulatory Requirements and Notification .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.