My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applicant, its officers , agents , or employees , associated with the <br /> placement, maintenance or removal of installations authorized by <br /> this permit . <br /> 5 . The applicant agrees to use all reasonable care under the given <br /> circumstances to assure that members of the traveling public are <br /> not unreasonably inconvenienced nor endangered by the activities <br /> conducted hereunder, including the use of reflectorized barriers , <br /> warning signals , flagmen , or other prudent measures . <br /> 6 . The validity of this permit is contingent upon applicant obtaining <br /> necessary permits from any other agencies having jurisdiction . <br /> Issuance of this permit does not relieve applicant of liability for <br /> trespass to private property. <br /> 7. This permit shall be considered a license only, for the limited <br /> purpose of installation , placement, and maintenance of the <br /> improvements specified on the face hereof, and does not convey <br /> any other right, title , or interest of the County in the subject right-of- <br /> way property. <br /> 8 . Applicant agrees to remove or alter such installations without <br /> objection or cost to the County as the County may direct, at any <br /> time and within a reasonable time after receipt of direction by the <br /> County Engineer or his authorized representative . <br /> 9 . Applicant is cautioned that electrical , water and sewer, or other <br /> installations or utilities may be located within the construction area , <br /> and applicant shall use diligent efforts to first detect and locate all <br /> such installations , and shall coordinate construction with all other <br /> lawful users of said right-of-way. Applicant shall be liable in every <br /> manner for all damages proximately resulting from its interference <br /> with or interruption of services provided by other lawful right-of-way <br /> users . <br /> 10 . In cases where a concrete driveway is to extend to a paved road , <br /> that portion of the driveway from property line to the edge of the <br /> road pavement shall be a minimum thickness of six (6 ) inches . If <br /> the road is unpaved , the concrete/asphalt driveway shall not extend <br /> beyond the property line . <br /> C . Other Permits Required : The Contractor is responsible for obtaining any <br /> discharge permits that may be required by local drainage districts . <br /> 1 . 02 NOTIFICATION <br /> A. <br /> Indian River County: The Contractor is required to notify the Indian River <br /> County Utilities Department 48 hours prior to initiating construction ( Michael <br /> 1060 - 2 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01060 Regulatory Requirements and Notification .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.