My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 06 MANUFACTURER' S CERTIFICATES <br /> A. Submit Certificates , in duplicate , in accordance with requirements <br /> of each specification section . <br /> 1 . 07 CONTRACTOR RESPONSIBILITIES <br /> A . Review Shop Drawings , Product Data and samples prior to <br /> submission . <br /> B . Determine and verify: <br /> 1 . Field measurements <br /> 2 . Field construction criteria <br /> 3 . Catalog numbers and similar data <br /> ' 4 . Conformance with specifications <br /> C . Coordinate each submittal with requirements of the work and of <br /> the Contract Documents , <br /> D . Notify the Engineer in writing at the time of submission of ANY <br /> AND ALL DEVIATIONS in the submittals from requirements of the <br /> Contract Documents . All of the Contractor's comments and <br /> notations shall be in red ink. <br /> E . Begin no fabrication of work which requires submittals until return <br /> of submittals with Engineer's approval . <br /> 1 .08 SUBMISSION REQUIREMENTS <br /> A. Make submittals promptly in accordance with approved schedule , <br /> and in such sequence as to cause no delay in the work of any <br /> other Contractor. <br /> B . Number of submittals required : <br /> 1 . Shop Drawings : Submit the number of opaque <br /> reproductions which the contractor requires , plus four (4 ) <br /> copies which will be retained by the Engineer. <br /> 2 , Product Data : Submit the number of copies which the <br /> ' Contractor requires , plus four (4 ) which will be retained by <br /> the Engineer. <br /> 3 , Samples : Submit the number stated in each specification <br /> section . <br /> C . Submittals shall contain : <br /> 1 . The date of submission and the dates of any previous <br /> submissions . <br /> 01340 - 3 <br /> FAUtilities\UTILITY - ENGINEERING\WTP - North ROW RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01340 Shop Drawings , Product Data and Samples.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.