My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 2 . The project title and number <br /> 3 . Contract identification <br /> 4 . The name of: <br /> a . Contractor <br /> b . Supplier <br /> C , Manufacturer <br /> 5 . Identification of the project, with specification section <br /> number. <br /> 6 . Field dimensions , clearly identified as such . <br /> 7 . Relation to adjacent or critical features of the Work or <br /> materials . <br /> 8 . Applicable standards , such as ASTM or Federal <br /> Specification numbers . <br /> 9 . Identification of deviations from Contract Documents <br /> 10 . Identification of revisions on . resubmittals . <br /> 11 . An 8" x 3" blank space for Contractor and Engineer stamps <br /> 12 . Contractor's stamp or review and approval , initialed or <br /> signed , certifying to review of initialed or signed , certifying <br /> to review of submittal , verification of products , field <br /> measurements and field construction criteria , and <br /> coordination of the information within the submittal with <br /> requirements of the work and of Contract Documents . <br /> 1 . 09 RESUBMISSION REQUIREMENTS <br /> A. Make any corrections or changes in the submittals required by the <br /> Engineer and resubmit until approved . <br /> B . Shop Drawings and Product Data : <br /> 1 . Revise initial drawings or data , and resubmit as specified <br /> for initial submittal . <br /> 2 . Indicate any changes which have been made other than <br /> those requested by the Engineer. <br /> C . Samples : Submit new samples as required for initial submittal . <br /> 1 . 10 DISTRIBUTION <br /> A . Distribute reproductions of Shop Drawings and copies of Product <br /> Data which carry the Engineer's stamp or review to : <br /> 1 . Job site file . <br /> 2 . Record Documents file . <br /> 3 . Other affected contractors <br /> 4 . Subcontractors <br /> 5 . Supplier or fabricator <br /> 01340 - 4 <br /> F:\Utilities\UTILITY - ENGINEERING\wTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01340 Shop Drawings , Product Data and Samples .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.