Laserfiche WebLink
SECTION 01720 <br /> PROJECT RECORD DOCUMENTS <br /> PART 1 -- GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A. Contractor shall maintain at the site for the Owner one record copy of the <br /> following : <br /> 1 . Drawings <br /> 2 , Specifications <br /> 3 , Addenda <br /> 4 . Change orders and other modifications to the Contract <br /> 5 . Engineer field orders or written instructions <br /> 6 . Approved shop drawings , product data , and samples <br /> 7 . Field test records <br /> B . Related requirements in the other parts of the Contract Documents : <br /> General Conditions of the Contract; Section 2 — Schedules , <br /> Reports and Records <br /> C . Related requirements specified in other sections : <br /> Section 01340 : Shop Drawings , Product Data and Samples <br /> 1 . 02 MAINTENANCE OF DOCUMENTS AND SAMPLES <br /> A . Contractor shall store documents and samples in the field office apart <br /> from documents used for construction . <br /> 1 . Provide files and racks for storage of documents . <br /> 2 . Provide locked cabinet or secure storage space for storage of <br /> samples . <br /> B . File documents and samples in accordance with Specifications — Table of <br /> Contents . <br /> C . Maintain documents in a clean , dry, legible condition and in good order. <br /> Do not use record documents for construction purposes . <br /> D . Make documents and samples available at all times for inspection by <br /> Engineer. <br /> 01720 - 1 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01720 Project Record Documents . doc <br />