My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1m0 MARKING DEVICES <br /> A. Provide felt tip marking pens for recording information in the color red . <br /> 1 . 04 RECORDING (SEE ALSO SPECIAL CONDITIONS) <br /> " D " in neat large A. Label each document PROJECT RECORD " printed letters . <br /> g <br /> B . Record information concurrently with construction progress . DO NOT <br /> conceal or backfill any work until required information is recorded . <br /> C . Drawings : Legibly mark to record actual construction : <br /> 1 . Depths of various elements of construction in relation to N . G . V . D . <br /> 1929 , <br /> 2 . Horizontal and vertical locations of underground utilities and <br /> appurtenances , referenced to permanent surface improvements . <br /> 3 . Location of internal utilities and appurtenances concealed in the <br /> construction , referenced to visible and accessible features of the <br /> structure . <br /> 4 . Field changes of dimension and detail <br /> 5 . Changes made by field order or by change order. <br /> 6 . Details not on original contract drawings . <br /> D . Specifications and Addenda : Legibly mark each section to record : <br /> 1 . Manufacturer, trade name , catalog number and supplier of each <br /> product and item of equipment actually installed . <br /> 2 . Changes made by field order or by change order. <br /> 1 . 05 SUBMITTAL <br /> A. At Contract close-out, deliver Record Documents to Engineer for the <br /> Owner <br /> B . Accompany submittal with transmittal letter in duplicate , containing : <br /> 1 . Date <br /> 2 . Project title and number <br /> 3 . Contractor's name and address <br /> 4 . Title and number of each Record Document <br /> 5 . Signature of Contractor or his authorized representative <br /> 01720 - 2 <br /> FAUtilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01720 Project Record Documents .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.