My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
which is found to be defective . An damage to the pipe s <br /> Y 9 p p hall be repaired <br /> as directed by the Engineer. If any defective pipe is discovered after it <br /> has been installed , it shall be removed and replaced with a sound pipe in <br /> a satisfactory manner by the Contractor, at his own expense . <br /> C . Under no circumstances shall the pipe or accessories be dropped into the <br /> trench . <br /> D . Care shall be taken during transportation of the pipe such that it will not <br /> be cut, kinked or otherwise damaged . <br /> E . Ropes , fabric or rubber protected slings and straps shall be used when <br /> handling pipes . Chains , cables or hooks inserted into the pipe ends shall <br /> not be used . Two slings spread apart shall be used for lifting each length <br /> of pipe . <br /> ' F . Pipes shall be stored on level ground , preferably turf or sand , free of <br /> sharp objects which could damage the pipe . Stacking of the polyethylene <br /> pipe shall be limited to a height that will not cause excessive deformation <br /> of the bottom layers of pipes under anticipated temperature conditions. <br /> Where necessary due to ground conditions , the pipe shall be stored on <br /> wooden sleepers , spaced suitably and of such width as not to allow <br /> deformation of the pipe at the point of contact with the sleeper or between <br /> supports . <br /> G . Care shall be exercised when lowering pipe into the trench to prevent <br /> damage or twisting of the pipe . <br /> ' H . Pipe shall be laid to lines and grade shown on the Drawings with bedding <br /> and backfill as shown on the Drawings . <br /> I . When laying is not in progress , including lunchtime , the open ends of the <br /> pipe shall be closed by fabricated plugs , or by other approved means . <br /> J . Pipe shall be stored on clean level ground to prevent undue scratching or <br /> gouging . The handling of the pipe shall be in such a manner that the pipe <br /> is not damaged by dragging it over sharp and cutting objects . The <br /> maximum allowable depth of cuts , scratches or gouges on the exterior of <br /> the pipe is 10 percent of wall thickness . The interior pipe surface shall be <br /> free of cuts , gouges or scratches . <br /> K . Sections of pipe with cuts , scratches or gouges exceeding five percent of <br /> the pipe wall thickness shall be removed completely and the ends of the <br /> pipeline rejoined . <br /> L . The pipe shall be joined by the method of thermal butt fusion , as outlined <br /> in ASTM D2657 . All joints shall be made in strict compliance with the <br /> ' manufacturer's recommendations . <br /> 02627 - 5 <br /> FAUtilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\02627 Water Mains High Density Ployethylene.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.