M . Mechanical connections of the polyethylene pipe to auxiliary equipment <br /> such as valves , pumps and tanks shall be through flanged connections <br /> which shall consist of the following : <br /> 1 . A polyethylene flange shall be thermally butt-fused to the stub end <br /> of the pipe . A carbon steel back-up ring shall be used on both <br /> sides of the connection prior to thermally butt-fusing the <br /> polyethylene flange . <br /> 2 . A 316 stainless steel back-up ring shall mate with a 316 stainless <br /> steel flange . <br /> 3 . Ductile iron back-up rings shall mate with cast iron flanges . <br /> N . Flange connections shall be provided with a full-face neoprene gasket. <br /> ' O . All PE pipe must be at the temperature of the surrounding soil at the time <br /> of backfilling and compaction . <br /> P . No single piece of pipe shall be laid unless it is straight. The centerline of <br /> the pipe shall not deviate from a straight line drawn between the centers <br /> of the openings at the ends of the pipe by more than 1 / 16-in per foot of <br /> length . If a piece of pipe fails to meet this requirement check for <br /> straightness , it shall be rejected and removed from the site . Laying <br /> instructions of the manufacturer shall be explicitly followed . <br /> Q . If a defective pipe is discovered after it has been installed , it shall be <br /> removed and replaced with a sound pipe in a satisfactory manner at no <br /> additional cost to the Owner. All pipe and fittings shall be thoroughly <br /> cleaned before installation , shall be kept clean until they are used in the <br /> work and when laid , shall conform to the Imes and grades required . <br /> R . As soon as the excavation is complete to normal grade of the bottom of <br /> the trench , bedding shall be placed , compacted and graded to provide <br /> firm , uniform and continuous support for the pipe . Bell holes shall be <br /> excavated so that only the barrel of the pipe bears upon the bedding . <br /> The pipe shall be laid accurately to the lines and grades indicated on the <br /> Drawings . Blocking under the pipe will not be permitted . Bedding shall <br /> be placed evenly on each side of the pipe to mid -diameter and hand tools <br /> shall be used to force the bedding under the haunches of the pipe and <br /> into the bell holes to give firm continuous support for the pipe . Bedding <br /> shall then be placed to 12-in above the top of the pipe . The initial 3-ft of <br /> backfill above the bedding shall be placed in 1 -ft layers and carefully <br /> compacted . Generally the compaction shall be done evenly on each side <br /> of the pipe and compaction equipment shall not be operated directly over <br /> the pipe until sufficient backfill has been placed to ensure that such <br /> compaction equipment will not have a damaging effect on the pipe . <br /> Equipment used in compacting the initial 3-ft backfill shall be approved by <br /> the pipe manufacturer's representative prior to use . <br /> 02627 - 6 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\02627 Water Mains High Density Ployethylene .doc <br />