My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02660 <br /> TESTING AND INSPECTION OF WATER MAINS <br /> 1 . 01 PRESSURE AND LEAKAGE TESTS OF UNDERGROUND PRESSURE <br /> PIPING <br /> A. Hydrostatic pressure and leakage tests shall conform with Section 4 of <br /> the latest edition of AWWA C-600 specifications with the exception that <br /> the Contractor shall furnish all gauges , meters , pressure pumps and other <br /> equipment needed to test the line . Engineer or designated representative <br /> shall be present during all testing , televising and final inspections . <br /> B . The pressure required for the field hydrostatic pressure test shall be 1 . 5 <br /> times the normal working pressure at the point of testing , and not less <br /> than 1 . 25 times the working pressure at the highest point along the test <br /> section , but not less than 150 psi ( 100 psi for force main . ) The Contractor <br /> shall provide temporary plugs and blocking necessary to maintain the <br /> required test pressure . Corporation cocks at least 1 inch in diameter, <br /> pipe riser, and angle globe valves shall be provided at each pipe dead- <br /> end in order to bleed air from the line . Duration of pressure test shall be <br /> at least 2 hours . The cost of these items shall be included as a part of <br /> testing . <br /> C . The leakage test shall be conducted concurrently with the hydrostatic <br /> pressure test and shall be of not less than 2 hours duration . All leaks <br /> evident at the surface shall be repaired and leakage eliminated <br /> 1 regardless of total leakage as shown by test . Lines that fail to meet tests <br /> shall be repaired and retested as necessary until test requirements are <br /> complied with . Defective materials , pipes , valves and accessories shall <br /> be removed and replaced . The pipelines shall be tested in such sections <br /> as may be directed by the Engineer by shutting valves or installing <br /> temporary plugs as required . The line shall be filled with water and all air <br /> removed , and the test pressure shall be maintained in the pipe for the <br /> entire test period by means of a force pump to be furnished by the <br /> Contractor. The amount of water required is a measure of the leakage . <br /> D . The Contractor must submit his plan for testing to the Engineer for review <br /> at least five (5 ) working days before starting the test. The Contractor <br /> shall remove and adequately dispose of all blocking material and <br /> equipment after completion and acceptance of the field hydrostatic test, <br /> unless otherwise directed by the Engineer. Any damage to the pipe <br /> coating shall be repaired by the Contractor. Lines shall be totally free and <br /> clean prior to final acceptance . <br /> E . The Engineer or the Engineer's representative must be present during <br /> testing . <br /> F . No thrust blocks shall be backfilled until inspected by p IRCDUS inspectors . <br /> 02660 - 1 <br /> FAUtilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> ' RO\BID DOCUMENTS\02660 Testing and Inspection of Water Mains . doc <br />