Laserfiche WebLink
does not involve a change in the Contract Price or the Contract 35. Project Manual--The bound documentary <br /> Times . information prepared for bidding and constructing the Work. A <br /> listing of the contents of the Project Manual , which may be <br /> 22. General Requirements--Sections of Division 1 of bound in one or more volumes , is contained in the table(s ) of <br /> the Specifications . The General Requirements pertain to all contents. <br /> sections of the Specifications . <br /> 36. Radioactive Material--Source, special nuclear, or <br /> 23. Hazardous Environmental Condition--The byproduct material as defined by the Atomic Energy Act of 1954 <br /> presence at the Site of Asbestos , PCBs, Petroleum, Hazardous (42 USC Section 2011 et seq . ) as amended from time to time. <br /> Waste, or Radioactive Material in such quantities or <br /> circumstances that may present a substantial danger to persons 37. Resident Project Representative--The authorized <br /> or property exposed thereto in connection with the Work. representative of ENGINEER who may be assigned to the Site <br /> or any part thereof. <br /> 24. Hazardous Waste—The term Hazardous Waste <br /> shall have the meaning provided in Section 1004 of the Solid 38. Samples—Physical examples of materials , <br /> Waste Disposal Act (42 USC Section 6903 ) as amended from equipment, or workmanship that are representative of some <br /> time to time. portion of the Work and which establish the standards by which <br /> such portion of the Work will be judged . <br /> 25. Laws and Regulations; Laws or Regulations—Any <br /> and all applicable laws , rules , regulations, ordinances, codes, 39. Shop Drawings—All drawings , diagrams, illustra- <br /> and orders of any and all governmental bodies, agencies , tions , schedules , and other data or <br /> information which are <br /> authorities, and courts having jurisdiction . specifically prepared or assembled by or for CONTRACTOR <br /> and submitted by CONTRACTOR to illustrate some portion of <br /> 26. Liens—Charges , security interests, or the Work. <br /> encumbrances upon Project funds , real property, or personal <br /> property. 40. Site—Lands or areas indicated in the Contract <br /> Documents as being furnished by OWNER upon which the <br /> 27. Milestone—A principal event specified in the Work is to be performed, including rights-of-way and <br /> easements <br /> Contract Documents relating to an intermediate completion date for access thereto, and such other lands furnished by OWNER <br /> or time prior to Substantial Completion of all the Work. which are designated for the use of CONTRACTOR. <br /> 28. Notice of Award—The written notice by OWNER 41 . Specifications--That part of the Contract <br /> to the apparent successful bidder stating that upon timely Documents consisting of written technical <br /> descriptions of <br /> compliance by the apparent successful bidder with the materials, equipment, systems , standards, and workmanship as <br /> conditions precedent listed therein, OWNER will sign and applied to the Work and certain administrative details applicable <br /> deliver the Agreement. thereto. <br /> 29. Notice to Proceed--A written notice given by 42. Subcontractor--An individual or entity having <br /> a <br /> OWNER to CONTRACTOR fixing the date on which the Con- direct contract with CONTRACTOR or with any other <br /> tract Times will commence to run and on which CONTRACTOR Subcontractor for the performance of a part of the Work at the <br /> shall start to perform the Work under the Contract Documents . Site. <br /> 30. OWNER--The individual , entity, public body, or 43. Substantial Completion--The time at which the <br /> authority with whom CONTRACTOR has entered into the Work (or a specified part thereofl has progressed to <br />the point <br /> Agreement and for whom the Work is to be performed. where, in the opinion of ENGINEER, the Work (or a specified <br /> part thereof) is sufficiently complete, in accordance with the <br /> 31 . Partial Utilization--Use by OWNER of a substan- Contract Documents , so that the Work (or a specified <br /> part <br /> tially completed part of the Work for the purpose for which it is thereof) can be utilized for the purposes for which it is <br /> intended. <br /> intended (or a related purpose) prior to Substantial Completion The terms "substantially complete" and "substantially com- <br /> of all the Work. pleted" as applied to all or part of the Work refer to Substantial <br /> Completion thereof. <br /> 32. PCBs—Polychlorinated biphenyls . <br /> 44 . Supplementary Conditions--That part of the <br /> 33. Petroleum—Petroleum , including crude oil or any Contract Documents which amends or supplements these <br /> fraction thereof which is liquid at standard conditions of General Conditions. <br /> temperature and pressure (60 degrees Fahrenheit and 14. 7 <br /> pounds per square inch absolute), such as oil , petroleum, fuel 45. Supplier--A manufacturer, fabricator, supplier, <br /> oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with distributor, materialman , or vendor having a direct <br /> contract with <br /> other non-Hazardous Waste and crude oils . CONTRACTOR or with any Subcontractor to furnish materials <br /> or equipment to be incorporated in the Work by CONTRACTOR <br /> 34. Project—The total construction of which the Work or any Subcontractor. <br /> to be performed under the Contract Documents may be the <br /> whole, or a part as may be indicated elsewhere in the Contract 46. Underground Facilities--All underground <br /> Documents. pipelines, conduits , ducts , cables , wires , manholes , vaults , <br /> tanks , tunnels , or other such facilities or attachments , and any <br /> encasements containing such facilities, including those that <br /> 00700 - 6 <br />