Laserfiche WebLink
convey electricity, gases, steam, liquid petroleum products , <br /> telephone or other communications , cable television, water, 1 . The word "defective," when modifying the word <br /> wastewater, storm water, other liquids or chemicals, or traffic or "Work," refers to Work that is unsatisfactory, faulty, <br /> or <br /> other control systems. deficient in that it does not conform to the Contract <br /> Documents or does not meet the requirements of any <br /> 47. Unit Price Work--Work to be paid for on the basis inspection, reference standard , test, or approval <br /> of unit prices. referred to in the Contract Documents , or has been <br /> damaged prior to ENGINEER's recommendation of final <br /> 48. Work—The entire completed construction or the payment (unless responsibility for the protection thereof <br /> various separately identifiable parts thereof required to be has been assumed by OWNER at Substantial <br /> provided under the Contract Documents. Work includes and is Completion in accordance with paragraph 14.04 or <br /> the result of performing or providing all labor, services, and 14.05). <br /> documentation necessary to produce such construction , and <br /> furnishing, installing , and incorporating all materials and equip- D . Furnish, Install, Perform, Provide <br /> ment into such construction , all as required by the Contract <br /> Documents. 1 . The word "furnish," when used in connection with <br /> services , materials , or equipment, shall mean to supply <br /> 49. Work Change Directive—A written statement to and deliver said services, materials , or equipment to the <br /> CONTRACTOR issued on or after the Effective Date of the Site (or some other specified location) ready for use <br /> or <br /> Agreement and signed by OWNER and recommended by installation and in usable or operable condition. <br /> ENGINEER ordering an addition , deletion, or revision in the <br /> Work, or responding to differing or unforeseen subsurface or 2. The word "install," when used in connection with <br /> physical conditions under which the Work is to be performed or services , materials , or equipment, shall mean to put into <br /> to emergencies . A Work Change Directive will not change the use or place in final position said services , materials , <br /> or <br /> Contract Price or the Contract Times but is evidence that the equipment complete and ready for intended use. <br /> parties expect that the change ordered or documented by a <br /> Work Change Directive will be incorporated in a subsequently 3. The words "perform" or "provide," when used in <br /> issued Change Order following negotiations by the parties as to connection with services, materials, or equipment, shall <br /> its effect, if any, on the Contract Price or Contract Times. mean to furnish and install said services, materials , or <br /> 50. Written Amendment—A written statement equipment complete and ready for intended use. <br /> modifying the Contract Documents , signed by OWNER and 4. When "furnish," "install ," "perform," or "provide" is <br /> CONTRACTOR on or after the Effective Date of the Agreement not used in connection with services, materials , or <br /> and normally dealing with the nonengineering or nontechnical equipment in a context clearly requiring an obligation <br /> of <br /> rather than strictly construction-related aspects of the Contract CONTRACTOR, "provide" is implied . <br /> Documents . <br /> E. Unless stated otherwise in the Contract Documents , <br /> 1 .02 Terminology words or phrases which have a well-known technical or <br /> construction industry or trade meaning are used in the Contract <br /> A. Intent of Certain Terms orAdjectives Documents in accordance with such recognized meaning . <br /> 1 . Whenever in the Contract Documents the terms <br /> "as allowed ," "as approved ," or terms of like effect or import ARTICLE 2 - PRELIMINARY MATTERS <br /> are used, or the adjectives "reasonable," "suitable," <br /> "acceptable," "proper," "satisfactory," or adjectives of like <br /> effect or import are used to describe an action or 2. 01 Delivery of Bonds <br /> determination of ENGINEER as to the Work, it is intended <br /> that such action or determination will be solely to evaluate, A. When CONTRACTOR delivers the executed <br /> in general, the completed Work for compliance with the Agreements to OWNER, CONTRACTOR shall also deliver <br /> to <br /> requirements of and information in the Contract Documents OWNER such Bonds as CONTRACTOR may be required to <br /> and conformance with the design concept of the completed furnish. <br /> Project as a functioning whole as shown or indicated in the <br /> Contract Documents (unless there is a specific statement 2. 02 Copies of Documents <br /> indicating otherwise). The use of any such term or adjective <br /> shall not be effective to assign to ENGINEER any duty or A. OWNER shall furnish to CONTRACTOR up to ten <br /> authority to supervise or direct the performance of the Work copies of the Contract Documents . Additional copies will be <br /> I or any duty or authority to undertake responsibility contrary furnished upon request at the cost of reproduction. <br /> to the provisions of paragraph 9. 10 or any other provision of <br /> the Contract Documents . 2. 03 Commencement of Contract Times; Notice to <br /> Proceed <br /> B . Day <br /> A. The Contract Times will commence to run on the <br /> 1 . The word "day" shall constitute a calendar day of thirtieth day after the Effective Date of the Agreement or, if <br /> a <br /> 24 hours measured from midnight to the next midnight. Notice to Proceed is given , on the day indicated in the Notice to <br /> Proceed . A Notice to Proceed may be given at any time within <br /> C. Defective 30 days after the Effective Date of the Agreement. In no event <br /> ' 00700 - 7 <br />