Laserfiche WebLink
' will the Contract Times commence to run later than the sixtieth among the parties as to the Work and to discuss the schedules <br /> day after the day of Bid opening or the thirtieth day after the referred to in paragraph 2. 05. 6 , procedures <br /> for handling Shop <br /> Effective Date of the Agreement, whichever date is earlier. Drawings and other submittals, processing Applications for <br /> ' 2 .04 Starting the Work Payment, and maintaining required records. <br /> A. CONTRACTOR shall start to perform the Work on the 2.07 Initial Acceptance of Schedules <br /> date when the Contract Times commence to run. No Work A. Unless otherwise provided in the Contract Docu- <br /> shall be done at the Site prior to the date on which the Contract ments , at least ten days before submission <br /> of the first <br /> Times commence to run. Application for Payment a conference attended by CON- <br /> TRACTOR, ENGINEER, and others as appropriate will be held <br /> 2. 05 Before Starting Construction to review for acceptability to ENGINEER as provided below the <br /> schedules submitted in accordance with paragraph 2.05. 13 . <br /> A. CONTRACTOR's Review of Contract Documents: CONTRACTOR shall have an additional ten days to make <br /> Before undertaking each part of the Work, CONTRACTOR shall corrections and adjustments and to complete and resubmit the <br /> carefully study and compare the Contract Documents and schedules . No progress payment shall be made <br /> to CON- <br /> check and verify pertinent figures therein and all applicable field TRACTOR until acceptable schedules are submitted to <br /> measurements . CONTRACTOR shall promptly report in writing ENGINEER. <br /> to ENGINEER any conflict, error, ambiguity, or discrepancy <br /> which CONTRACTOR may discover and shall obtain a written 1 .The progress schedule will be acceptable to <br /> interpretation or clarification from ENGINEER before proceeding ENGINEER if it provides an orderly progression of the <br /> with any Work affected thereby; however, CONTRACTOR shall Work to completion within any specified Milestones and <br /> not be liable to OWNER or ENGINEER for failure to report any the Contract Times . Such acceptance will not impose <br /> conflict, error, ambiguity, or discrepancy in the Contract on ENGINEER responsibility for the progress schedule, <br /> Documents unless CONTRACTOR knew or reasonably should for sequencing , scheduling, or progress of the Work nor <br /> have known thereof. interfere with or relieve CONTRACTOR from <br /> B . Preliminary Schedules: Within ten days after the CONTRACTOR's full responsibility therefore. <br /> Effective Date of the Agreement (unless otherwise specified in 2. CONTRACTOR's schedule of Shop Drawing and <br /> the General Requirements), CONTRACTOR shall submit to Sample submittals will be acceptable to ENGINEER if it <br /> ENGINEER for its timely review: provides a workable arrangement for reviewing and <br /> processing the required submittals . <br /> 1 . a preliminary progress schedule indicating the <br /> times (numbers of days or dates) for starting and & CONTRACTOR's schedule of values will <br /> be <br /> completing the various stages of the Work, including acceptable to ENGINEER as to form and substance if it <br /> any Milestones specified in the Contract Documents; provides a reasonable allocation of the Contract Price to <br /> component parts of the Work. <br /> 2. a preliminary schedule of Shop Drawing and <br /> Sample submittals which will list each required submittal <br /> and the times for submitting , reviewing , and processing ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, <br /> such submittal; and AMENDING , REUSE <br /> 3. a preliminary schedule of values for all of the <br /> Work which includes quantities and prices of items 3 .01 Intent <br /> which when added together equal the Contract Price <br /> and subdivides the Work into component parts in A. The Contract Documents are complementary; what <br /> sufficient detail to serve as the basis for progress is called for by one is as binding as if called <br /> for by all. <br /> payments during performance of the Work. Such prices <br /> will include an appropriate amount of overhead and B. It is the intent of the Contract Documents to describe <br /> profit applicable to each item of Work. a functionally complete Project (or part thereof) to be <br /> constructed in accordance with the Contract Documents . Any <br /> C. Evidence of Insurance: Before any Work at the Site is labor, documentation , services , materials , or equipment that <br /> started, CONTRACTOR and OWNER shall each deliver to the may reasonably be inferred from the Contract Documents or <br /> other, with copies to each additional insured identified in the from prevailing custom or trade usage as <br /> being required to <br /> Supplementary Conditions , certificates of insurance (and other produce the intended result will be provided whether <br /> or not <br /> evidence of insurance which either of them or any additional specifically called for at no additional cost to OWNER. <br /> insured may reasonably request) which CONTRACTOR and <br /> OWNER respectively are required to purchase and maintain in C. Clarifications and interpretations of the Contract <br /> accordance with Article 5. Documents shall be issued by ENGINEER as provided in Article <br /> 9. <br /> 2. 06 Preconstruction Conference <br /> A. Within 20 days after the Contract Times start to run , <br /> but before any Work at the Site is started , a conference <br /> attended by CONTRACTOR, ENGINEER, and others as <br /> appropriate will be held to establish a working understanding <br /> 00700 - 8 <br />