My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. BID SECURITY <br /> 6 . 1 Each Bid must be accompanied by Bid security made payable to Owner in an <br /> amount of five percent of the Bidder's maximum bid price and in the form of a <br /> certified or bank check or a Bid Bond issued by a surety meeting the <br /> requirements of Paragraph 5 . 1 of the General Conditions , <br /> 6 . 2 The Bid security of the Successful Bidder will be retained until such Bidder has <br /> executed the Agreement and furnished the required Contract security, whereupon <br /> the Bid security will be returned . If the Successful Bidder fails to execute and <br /> deliver the Agreement and furnish the required Contract security within fifteen <br /> days after the Notice of Award , Owner may annul the Notice of Award , and the <br /> Bid security of that Bidder will be forfeited . <br /> The Bid security of other Bidders whom Owner believes to have a reasonable <br /> chance of receiving the award may be retained by the Owner until the earlier of <br /> the seventh day after the effective date of the Agreement or the sixty-first day <br /> after the Bid opening , whereupon Bid security furnished by such Bidders will be <br /> returned . Bid security with bids which are not competitive may be returned before <br /> the end of the sixty-day period . <br /> 7 . CONTRACT TIME <br /> The number of days within which , or dates by which , the work is to be substantially <br /> completed and also complete and ready for final payment (the Contract Time ) are set <br /> forth in the Bid Form and the Agreement. <br /> 8 . LIQUIDATED DAMAGES <br /> Provisions for liquidated damages , if any, are set forth in the Agreement. <br /> 9 . SUBSTITUTE OR "OR EQUAL" ITEMS <br /> The Contract , if awarded , will be on the basis of materials and equipment described in <br /> the Drawings or specified in the Specifications without consideration of possible <br /> substitute or "or equal" items . Whenever it is indicated in the Drawings or specified in <br /> ' the Specifications that a substitute or "or equal " item of material or equipment may be <br /> furnished or used by Contractor if acceptable to Engineer, application for such <br /> acceptance will not be considered by Engineer until after the Effective Date of the <br /> Agreement. The procedure for submission of any such application by Contractor and <br /> consideration by Engineer is set forth in Paragraphs 6 . 7 . 1 , 6 . 7 . 2 , and 6 . 7 . 3 of <br /> the <br /> General Conditions and may be supplemented in the General Requirements . <br /> 10 . BID FORM <br /> 10 . 1 The Bid Form is included with the Bidding Documents ; additional copies <br /> may be obtained from Engineer (or the issuing office ) . <br /> 00100 - 4 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\00100 Instruction To Bidders .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.