Laserfiche WebLink
1 . 04 PRODUCT DATA <br /> A. Preparation : <br /> 1 . Clearly mark each copy to identify applicable products , <br /> models , options , and other data . <br /> 2 . Show performance characteristics and capacities . <br /> 3 . Show dimensions and clearances required . <br /> 4 . Show wiring or piping diagrams and controls . <br /> B . Manufacturer's standard schematic drawings and diagrams : <br /> 1 . Modify drawings and diagrams to delete information that is <br /> not applicable to the work. <br /> 2 . Supplement standard information to provide information <br /> specifically applicable to the work . <br /> 3 . Include manufacturer's installation instructions when <br /> required by the Specifications Section . <br /> 1 . 05 SAMPLES <br /> A . Office Samples : Limit to items requiring color, pattern and similar <br /> selections and shall be sufficient size and quantity to clearly <br /> illustrate : <br /> 1 . Full range of color, texture and pattern <br /> 2 . Submit samples for selection of finishes within sixty (60 ) <br /> days after date of Agreement, or when directed by <br /> Engineer. <br /> B . Field Samples and Mock-ups : <br /> 1 . Functional characteristics of the product, with integrally <br /> related parts and attachment devices . <br /> 2 . Contractor shall erect, at the Project Site , at a location <br /> acceptable to the Engineer <br /> 3 . Size of Area : that specified in the respective specification <br /> section . <br /> 4 . Fabricate each sample and mockup complete and finished . <br /> 5 . Include identification on each sample , giving full <br /> information . <br /> 6 . Remove samples at conclusion of Work , or when <br /> acceptable to the Engineer. <br /> 40 <br /> 01340 - 2 <br /> R Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\01340 <br /> Shop Drawings, Product Data and Samples .doc <br />