Laserfiche WebLink
1m0 MANUFACTURER' S CERTIFICATES <br /> A. Submit Certificates , in duplicate , in accordance with requirements <br /> of each specification section . <br /> 1 . 07 CONTRACTOR RESPONSIBILITIES <br /> A. Review Shop Drawings , Product Data and samples prior to <br /> submission . <br /> B . Determine and verify: <br /> 1 . Field measurements <br /> 2 . Field construction criteria <br /> 3 . Catalog numbers and similar data <br /> 4 . Conformance with specifications <br /> C . Coordinate each submittal with requirements of the work and of <br /> the Contract Documents , <br /> D . Notify the Engineer in writing at the time of submission of ANY <br /> AND ALL DEVIATIONS in the submittals from requirements of the <br /> Contract Documents . All of the Contractor's comments and <br /> notations shall be in red ink . <br /> E . Begin no fabrication of work that requires submittals until return of <br /> submittals with Engineer's approval . <br /> 1 . 08 SUBMISSION REQUIREMENTS <br /> A. Make submittals promptly in accordance with approved schedule , <br /> and in such sequence as to cause no delay in the work of any <br /> other Contractor. <br /> B . Number of submittals required : <br /> 1 . Shop Drawings : Submit the number of opaque <br /> reproductions that the contractor requires , plus four (4) <br /> copies that will be retained by the Engineer. <br /> 2 . Product Data : Submit the number of copies that the <br /> Contractor requires , plus four (4) that will be retained by <br /> the Engineer. <br /> 3 . Samples : Submit the number stated in each specification <br /> section . <br /> C . Submittals shall contain : <br /> 1 . The date of submission and the dates of any previous <br /> • submissions . <br /> 01340 - 3 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\01340 <br /> Shop Drawings , Product Data and Samples. doc <br />