My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . The project title and number <br /> 3 . Contract identification <br /> 4 . The name of: <br /> a . Contractor <br /> b . Supplier <br /> C, Manufacturer <br /> 5 . Identification of the project, with specification section <br /> number. <br /> 6 . Field dimensions , clearly identified as such . <br /> 7 . Relation to adjacent or critical features of the Work or <br /> materials . <br /> 8 . Applicable standards , such as ASTM or Federal <br /> Specification numbers . <br /> 9 . Identification of deviations from Contract Documents <br /> 10 . Identification of revisions on resubmittals . <br /> 11 . An 8 " x 3" blank space for Contractor and Engineer stamps <br /> 12 . Contractor's stamp or review and approval , initialed or <br /> signed , certifying to review of initialed or signed , certifying <br /> to review of submittal , verification of products , field <br /> measurements and field construction criteria , and <br /> coordination of the information within the submittal with <br /> requirements of the work and of Contract Documents . <br /> • 1 . 09 RESUBMISSION REQUIREMENTS <br /> A. Make any corrections or changes in the submittals required by the <br /> Engineer and resubmit until approved . <br /> B . Shop Drawings and Product Data : <br /> 1 . Revise initial drawings or data , and resubmit as specified <br /> for initial submittal . <br /> 2 . Indicate any changes that have been made other than <br /> those requested by the Engineer. <br /> C . Samples : Submit new samples as required for initial submittal . <br /> 1 . 10 DISTRIBUTION <br /> A . Distribute reproductions of Shop Drawings and copies of Product <br /> Data which carry the Engineer's stamp or review to : <br /> 1 . Job site file . <br /> 2 . Record Documents file . <br /> 3 . Other affected contractors <br /> 4 . Subcontractors <br /> 5 . Supplier or fabricator <br /> • <br /> 01340 - 4 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\131d docs\specs\01340 <br /> Shop Drawings , Product Data and Samples. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.