My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . Provide POWER CENTERS for miscellaneous tools and <br /> equipment used in the work : <br /> 1 . Weatherproof distribution box with minimum of four 20- <br /> amp . , 120-volt grounded outlets . <br /> 2 . Locate so that power is available at any point of use with <br /> minimum 100-foot CONSTRUCTION-TYPE power cords . <br /> 3 . Provide circuit breaker protection for each outlet . <br /> E . Provide adequate artificial lighting for all areas of work, when <br /> natural light is not adequate for work , and for areas accessible to <br /> persons other than Contractor' s employees . <br /> F . If Contractor requires service other than specified above , he shall <br /> arrange for, provide maintenance , and pay all costs incurred . <br /> 2 . 03 TEMPORARY WATER <br /> Contractor shall make arrangements with Owner for all temporary water <br /> at the project site . Contractor shall pay for all temporary water required <br /> for his operations . <br /> 2 . 04 TEMPORARY SANITARY FACILITIES <br /> A. Contractor shall provide temporary sanitary facilities in compliance <br /> with laws and regulations . <br /> B . Contractor shall provide for regular service , cleaning , and <br /> maintenance of temporary facilities and enclosures . <br /> PART 3 -- EXECUTION <br /> 3 .01 REMOVAL <br /> A. Completely remove temporary materials and equipment when <br /> their use is no longer required . <br /> B . Clean and repair damage caused by temporary installations or <br /> use of temporary facilities . <br /> C . Restore existing facilities used for temporary services to specified , <br /> or to original , condition . <br /> END OF SECTION <br /> 01510 - 2 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid <br /> docs\specs\01510 Temporary Utilities .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.