My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01560 <br /> TEMPORARY CONTROLS <br /> PART 1 -- GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A. Furnish , install , and maintain temporary control facilities required <br /> for construction ; remove on completion of entire project any <br /> features not intended to remain on the project site . <br /> B . Provide noise control , dust control , water control , debris control , <br /> pollution control and erosion control as specified in the appropriate <br /> sections of these documents . <br /> 1 . 02 REQUIREMENTS OF REGULATORY AGENCIES <br /> A. Comply with federal , state , and local codes and regulations and <br /> utility company requirements . <br /> B . Comply with Florida Department of Transportation requirements . <br /> PART 2 -- PRODUCTS <br /> 2 . 01 MATERIALS (GENERAL) <br /> A. Materials may be new or used , but must be adequate in capacity <br /> and quality for the required usage , MUST NOT create unsafe <br /> conditions and MUST NOT violate requirements of applicable <br /> codes and standards . <br /> 2 . 02 TEMPORARY NOISE CONTROL <br /> A. Mechanical equipment shall be fitted with mufflers to reduce noise <br /> from internal combustion type engines . <br /> B . Bells , sirens , alarms , etc. , shall be adjusted to provide adequate <br /> warnings to personnel on the project site ; however, they shall be <br /> regulated to an intensity that is amenable to the neighboring <br /> communities . <br /> C . Exterior construction work noises shall be kept to a minimum <br /> during evening , night, and early morning hours . In addition , <br /> weekend and holiday noises shall be limited to acceptable levels . <br /> D . In addition to on-site control , noise considerations shall be made <br /> to off-site vehicles and equipment (mobilization , demobilization , <br /> deliveries , etc. ) . <br /> 01560 - 1 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid <br /> docs\specs\01560 Temporary Controls .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.