Laserfiche WebLink
2 . 03 TEMPORARY DUST CONTROL <br /> The Contractor shall control dust formed as a result of the construction . <br /> Cleaning of work areas and application of dust control materials are the <br /> most effective methods of dust control . <br /> 2 . 04 TEMPORARY WATER CONTROL <br /> A. The Contractor shall control the flow of water through the <br /> construction site such that it does not damage any constructed <br /> items ; however, it shall be diverted and channeled to effectively <br /> leave the site as soon as possible . Puddling and ponding on the <br /> site is not permitted . <br /> B . Water shall be controlled such that it does not enter excavated <br /> areas , nor is deposited on or against constructed features . <br /> 2 .05 TEMPORARY DEBRIS CONTROL <br /> A . Provision shall be made by each Contractor to have available <br /> adequate containers to hold any and all debris that is to be <br /> generated from the project. Containers should be covered to <br /> prevent wind blowing paper, plastic, and lightweight products <br /> • around and off the site . <br /> B . Instructions shall be given to personnel to utilize the trash <br /> containers . Containers shall be placed in convenient places at the <br /> site . <br /> C . At least daily a thorough cleaning of trash and debris shall be <br /> made at the construction site . An acceptable method of disposal <br /> shall be employed . <br /> END OF SECTION <br /> 01560 - 2 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid <br /> docs\specs\01560 Temporary Controls . doc <br />