Laserfiche WebLink
SECTION 01000 <br /> SUMMARY OF WORK <br /> PART 1 -- GENERAL <br /> 1 .01 LOCATION OF WORK <br /> The work is generally located in the West Side Subdivision road right-of-ways , as <br /> shown on the construction plans . <br /> 1 . 02 DESCRIPTION OF WORK <br /> Construction of approximately 2 , 453 L . F. of 6" PVC water main and 25 L . F . of 6" PE horizontal <br /> directional bore in the West Side Subdivision . The proposed system is to connect to the existing <br /> water main with a tapping sleeve and valve at the intersection of 5th Street S . W . and 40th Avenue . <br /> The right-of-way is to be restored as close as possible to the pre-construction condition or better. <br /> Construction consists of, but is not limited to , utilities exploration , coordination with any permitting <br /> agencies , trenching , dewatering , installation of pipe with fittings and all appurtenances , restrainers <br /> and soil compaction , disinfections , testing (includes providing temporary jumper or another <br /> approved method for disinfections and flushing ) irrigation repair and traffic control . PVC pipe shall <br /> be C-900 and/ or C-909 and PE pipe shall comply with AWWA Specifications C-906-90 , these <br /> contract specifications , and per Indian River County Department of Utility Services Standards and <br /> . Specifications . The Contractor shall clearly specify the one used on the bid . <br /> PART 2 -- PRODUCTS <br /> Not applicable <br /> PART 3 -- EXECUTION <br /> Not applicable <br /> END OF SECTION <br /> 01000 - 1 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid docs\specs\01000 <br /> Summary Of Work . doc <br />