My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01025 <br /> MEASUREMENT AND PAYMENT FOR UNIT PRICE CONTRACTS <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted <br /> in accordance with the Contract Documents . No separate payment will be <br /> made for excavation , trenching dewatering , backfilling , leakage tests , <br /> surveying , density tests , or other incidental items of work not shown in the <br /> Agreement. <br /> 1 . 02 EQUIPMENT AND MATERIALS IN STORAGE <br /> Partial payment for materials and equipment in proper storage at the site of <br /> the work or other approved storage site will be made for those items for which <br /> the Contractor has submitted paid invoices to the Engineer. The partial <br /> payment for stored materials will be 50 % of the value of materials and <br /> equipment , based on receipted bills , furnished but not incorporated in the <br /> work , as determined by Engineer. <br /> 1 . 03 MEASUREMENT <br /> A . Mobilization : Measurement shall be on a lump sum unit price basis , and <br /> shall be limited to the following maximum amounts : <br /> ORIGINAL CONTRACT AMOUNT ($ ) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 100 , 000 39000 <br /> 100 , 000 5009000 15 , 000 <br /> 500 , 000 110009000 30 , 000 <br /> 19000 , 000 210009000 607000 <br /> 21000, 000 31000 , 000 909000 <br /> 310007000 410009000 1207000 <br /> 41000, 000 510009000 1259000 <br /> 59000, 000 61000 , 000 150 , 000 <br /> 61000 , 000 79000 , 000 175 , 000 <br /> 79000 , 000 10 , 000 , 000 200 , 000 <br /> 10 , 0007000 ------------- 250 , 000 <br /> Should the lump sum price bid for the item Mobilization exceed the maximum <br /> permissible amount for this item , as specified herein , the bid price will be <br /> reduced to the maximum permissible amount , and the reduced price will be <br /> used in correctly determining the total price for comparison of bids received . <br /> The cost of video taping the pre-construction condition shall be included in <br /> the lump-sum cost of mobilization . <br /> B . Pipe : Measurement for payment for pipe shall be per linear foot for each <br /> size pipe installed . Pipe will be measured along the centerline of the pipe <br /> installed (including driveway bores ) . No deduction will be made for the length <br /> 01025- 1 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid <br /> docs\specs\01025 Measurement and Payment. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.