My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-113
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 2:21:16 PM
Creation date
9/30/2015 10:41:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
04/03/2007
Control Number
2007-113
Agenda Item Number
7.J.
Entity Name
Masteller & Moler,Inc.
Subject
Addendum No.13 County Route 512 Corridor Improvements
Phase IV Corridor Improvements
Area
Roseland Rd. to I-95 CR 512
Supplemental fields
SmeadsoftID
6236
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum # 13 <br /> 3/22/2007 <br /> Page 4 of 7 <br /> Task C — Additional Sidewalk Design & Permitting <br /> Masteller & Moler, Inc. shall provide professional engineering services for the design, <br /> permitting, bidding and services for the construction of sidewalk improvements to the north side <br /> of County Route 512 from 108'h Avenue west under the 1-95 overpass to the western limit of the <br /> FDOT Limited Access Easement, a distance of approximately 1 .750 linear feet. <br /> This work is being implemented to provide professional engineering services by Masteller & <br /> Moler, Inc. associated with the project described above. The work to be performed will <br /> generally include the preparation of base plans, construction plans, permit applications and cost <br /> estimates to support the construction of the sidewalk. <br /> The Scope of Services for Task C is provided below: <br /> I — SurvevinQ Data Coordination <br /> The proposed sidewalk extension is beyond the limits of Phase IV roadway <br /> improvements. Masteller, Moler, Reed, & Taylor, Inc. (MMRT) has performed a route <br /> survey of both Phase IV and Phase V of CR-512 to support the design of roadway <br /> improvements. The survey data illustrates all improvements along CR-512 at the I-95 <br /> interchange. Under this task, we will coordinate with MMRT to obtain their route survey <br /> and incorporate it into our base plans. <br /> 2 —Base Plans <br /> The proposed sidewalk extension is beyond the limits of Phase IV roadway <br /> improvements. Base Plans will be developed from the existing CR 512 Phase IV and <br /> Phase V Route Survey and Design Plans for Phase IV CR-512 Roadway Improvements. <br /> The base plans shall include coordinate points with reference to the State Plane <br /> Coordinate System to facilitate the incorporation of the plans into the County' s GIS <br /> system. <br /> 3 — Construction Plans <br /> Masteller & Moler, hie. will utilize the previously completed route survey information <br /> and the CR 512 Phase IV roadway designs for preparation of construction plans for the <br /> sidewalk. Our plans will show the sidewalk, cross-walk striping at roadway crossings, <br /> and cross-sections at pertinent locations. <br /> 4 - Permitting <br /> Masteller & Moler, Inc. shall prepare and submit applications for the following permits: <br /> • Florida Department of Transportation (FDOT) General Use Permit <br /> • Florida Department of Transportation (FDOT) Drainage Permit <br /> • Indian River County — Right of Way Permit <br /> Permit application fees are not included in this Proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.