My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-113
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 2:21:16 PM
Creation date
9/30/2015 10:41:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
04/03/2007
Control Number
2007-113
Agenda Item Number
7.J.
Entity Name
Masteller & Moler,Inc.
Subject
Addendum No.13 County Route 512 Corridor Improvements
Phase IV Corridor Improvements
Area
Roseland Rd. to I-95 CR 512
Supplemental fields
SmeadsoftID
6236
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum # 13 <br /> 3/22/2007 <br /> Page 5 of 7 <br /> We propose to perform the Scope of Services outlined under "Task C" as follows: <br /> 1 - 4 (Survey, Base Plans, Construction Plans, & Permitting): $ 11 ,510.00 <br /> Task D — Improvements to 101't Avenue at CR-512 <br /> Masteller & Moler, Inc. shall provide professional engineering services for the design, <br /> permitting, bidding and services for the construction of a north-bound left tum lane on 101 " <br /> Avenue at CR-512. This tum lane will replace the existing left tum lane at the subject location <br /> since the existing lane will be truncated by the proposed CR-512 improvements. <br /> The proposed tum lane will be designed as a center widening similar to the existing turn lane, <br /> and will provide 2801f of storage with a 501f taper. The transition to the two-lane section will be <br /> designed in accordance with the design speed of 101 " Avenue and discussion with the County <br /> Engineer and Assistant Public Works Director. <br /> The Scope of Services for Task D is provided below: <br /> 1 — Route Survey <br /> Using data from their survey of the CR-512 right of way, our partner company, MMRT, <br /> will conduct a survey of the 101 " Avenue right of way to a point approximately 1 ,000 If <br /> south of the proposed CR-512 south edge of pavement. The survey will illustrate the <br /> horizontal and vertical location of all visible improvements including existing pavement, <br /> residential driveways, drainage features, utility poles, etc. This survey will serve as the <br /> basis of the 101 " Avenue roadway design. <br /> 2 —Base Plans <br /> Using the route survey provided by MMRT we will develop Base Plans for the 101 't <br /> Avenue Improvements to match the proposed CR 512 Phase IV Roadway Improvements. <br /> The base plans shall include coordinate points with reference to the State Plane <br /> Coordinate System to facilitate the incorporation of the plans into the County' s GIS <br /> system. <br /> 3 — Construction Plans & Cost Estimate <br /> We will develop Construction Plans to detail the proposed improvements along 101 " <br /> Avenue and the connection to proposed CR-512 improvements at the north end of project <br /> and the existing 101 " Avenue roadway at the south end of the project. Our plans will <br /> include a summary of quantities, typical cross-section, plan view, centerline and swale <br /> profiles, cross-sections at each roadway station, and details of construction elements. We <br /> will also prepare a Construction Cost Estimate as part of this subtask. <br />
The URL can be used to link to this page
Your browser does not support the video tag.