My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-222
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 12:00:02 PM
Creation date
9/30/2015 8:54:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
06/21/2005
Control Number
2005-222
Agenda Item Number
11.I.2
Entity Name
Masteller & Moler, Inc.
Subject
Addendum #8 to Contract
CR 512 Paving and Drainage Improvements
Area
County Route 512 Roseland Road to I-95
Project Number
9611
Supplemental fields
SmeadsoftID
5032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Addendum #8 <br /> Rev. 04/07/05 <br /> Page 5 of 6 <br /> Task E — Landscaue & Irdeation Plan Modifications <br /> This Task includes the scope of services as described in attached Sub-consultant proposal from <br /> Brad Smith Associates, Inc . <br /> Landscape & Irrigation Plans Modifications Fee $ 137156. 00 <br /> Task F = Permit Modifications <br /> Modifications to the St. Johns River Water Management District ( SJRWMD) Environmental <br /> Resource Permit (ERP) and an Army Corps of Engineers (ACOE) permit will need to be <br /> obtained prior to commencement of Phase III and IV construction activities . <br /> Once final alignment has been approved by Indian River County Engineering, ESI will assist the <br /> project engineer with the preparation of the environmental section of the ERP application for <br /> submittal to SJRWMD . This task will include the preparation of six (6) copies of supplemental <br /> materials and one ( 1 ) electronic copy. Two requests for additional information will be prepared <br /> as part of this Task. <br /> Note : it is assumed that mitigation previously negotiated as part of the original permit and <br /> application can be used for this modification. <br /> ESI will prepare a separate ERP application specific to CE wetland impacts associated with the <br /> bridge at Sebastian Creek. Separate dredge/fill drawings will be prepared for this application as <br /> well as preparation of CE ' s Public Notice and Statement of Findings. <br /> This Addendum includes making application for modifications to the previously issued <br /> SJRWMD ERP and an ACOE permit for the overall Project . <br /> We propose to perform the Scope of Services outlined under Task E for the following lump sum <br /> fees : <br /> SJRWMD Environmental Resource Permit <br /> Stormwater Permitting (M&M) . $ 141500 . 00 <br /> Environmental Permitting. . (M&M/ESI) $ 6, 900 . 00 <br /> Army Corps of Engineers Permit (M&M/ESI) $ 7, 300 . 00 <br /> Florida DOT Permit (Left Turn Lane at 108'' Avenue) $ 3 , 500 . 00 <br /> In order to complete the above-described modifications to the four (4) lane roadway alignment, <br /> we will need to be provided with the County ' s completed alignment modifications in digital <br /> format in Autocadd . <br />
The URL can be used to link to this page
Your browser does not support the video tag.