My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-222
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 12:00:02 PM
Creation date
9/30/2015 8:54:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
06/21/2005
Control Number
2005-222
Agenda Item Number
11.I.2
Entity Name
Masteller & Moler, Inc.
Subject
Addendum #8 to Contract
CR 512 Paving and Drainage Improvements
Area
County Route 512 Roseland Road to I-95
Project Number
9611
Supplemental fields
SmeadsoftID
5032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Addendum #8 <br /> Rev. 04/07/05 <br /> Page 4 of 6 <br /> This addendum includes making design revisions to the Lake C stormwater lake (on its original <br /> site) based on the updated stormwater management report . <br /> In order to complete the design modifications, we shall revise the Construction Plans including <br /> Plan & Profile Views, Cross-sections, Summary of Quantities, Stormwater Lake Plans, Utility <br /> Alignment Plans and Wetland Mitigation Plans . <br /> We propose to perform the Scope of Services outlined under Task C for the following lump sum <br /> fees : <br /> Construction Plan Modifications (Phase III) . . . . . . . . . . . . . . . . . . . . . . . $ 28, 650 . 00 <br /> Task D — Phase IV Construction Plans Modifications <br /> Construction Plans and Specifications shall be amended to increase the length of Phase IV from <br /> approximately Station 113 +00 to Station 259+00 as depicted on "Overall Exhibit of Proposed <br /> Right-of-way-County Route 512" printed August 2, 2004 provided to Masteller & Moler, Inc. by <br /> Christopher J. Kafer, Jr. P .E . , Indian River County Engineer. Furthermore, Construction Plans <br /> and Specifications shall be amended to incorporate modifications to the alignment of the four (4) <br /> lane roadway design from approximately Station 113 +00 to Station 264+00 as depicted on <br /> "Overall Exhibit of Proposed Right-of-way-County Route 512" printed August 2, 2004 provided <br /> to Masteller & Moler, Inc. by Christopher J. Kafer, Jr. P .E . , Indian River County Engineer. <br /> The Plans shall be amended to incorporate a curbed median to allow the County to install <br /> landscaping along the CR 512 corridor between the eastbound and westbound lanes . In addition, <br /> the Construction Plans shall be expanded to include an eastbound left turn lane at 108'" Avenue . <br /> This Addendum includes making design revisions to the Lake A & B stormwater lakes on their <br /> respective original sites . <br /> In order to complete the design modifications, we shall revise the Construction Plans including <br /> Plan & Profile Views, Cross-sections, Summary of Quantities, Intersection Plans (Middle School <br /> & 102 Terrace), Stormwater Lakes A & B Plans, and Utility Alignment Plans . <br /> We propose to perform the Scope of Services outlined under Task D for the following lump sum <br /> fees : <br /> Construction Plan Modifications (Phase IV) . . . . . . . . . . . . . . . . . . . $ 861000 . 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.