Laserfiche WebLink
• Addendum #8 <br /> Rev. 04/07/05 <br /> Page 3 of 6 <br /> Task B — Stormwater Management Report & Wetland Mitigation Modifications <br /> The proposed change to the alignment of the roadway improvements will require modifications <br /> to both the stormwater management and wetland mitigation designs . <br /> This Addendum includes preparation of a modified Stormwater Management Report to support <br /> the modified roadway Construction Plans. The proposed modified roadway alignment will <br /> require a new stormwater management analysis for previously designed post-development <br /> stormwater basins A, B & C only. (No modification to the previously design post-development <br /> stormwater basins D & E is included in this addendum) . The Stormwater Management Report <br /> shall be designed to demonstrate that the modified stormwater improvements will provide for <br /> treatment and attenuation of storm runoff in conformance with St . Johns River Water <br /> Management District (SJRWMD) rules and regulations . <br /> Utilizing the updated wetland jurisdictional line information, we shall develop a new summary of <br /> proposed wetlands impacts based on the new alignment . Utilizing the updated summary, we <br /> shall modify the original wetland mitigation design. The modified design of the Wetland <br /> Mitigation Plans shall be a refinement of the original design based on the updated wetlands <br /> impact summary. Mitigation Plans will again be included only within the Phase III Contract <br /> Plans, but will provide mitigation for wetland impacts for both Phases III and IV of the CR 512 <br /> Roadway Improvements project . (This proposal does not include substantial changes to the <br /> original wetland mitigation design concepts. Wetland mitigation will be provided based on the <br /> original conservation easement proposed on the Lake E Site and work proposed within the St . <br /> Sebastian River Preserve. ) <br /> This Task also includes the scope of services as described in the attached Sub-consultant <br /> proposal from Environmental Services, Inc . (ESI) dated September 23 , 2004, Task 8 . <br /> We propose to perform the Scope of Services outlined under Task B for the following lump sum <br /> fees : <br /> Stormwater Management Report (MM) . . . . . . . . . . . . . . . . . . . . . . . $ 14, 500. 00 <br /> Wetland Mitigation Planning (ESI Task 8) . . $ 27300. 00 <br /> Wetland Mitigation Design Coordination (MM) $ 21000. 00 <br /> Task C - Phase III Construction Plans Modifications <br /> Construction Plans and Specifications shall be amended to reduce the length of the Phase III of <br /> the four (4) lane roadway design from approximately Station 113 +00 to Station 259+00 as <br /> depicted on "Overall Exhibit of Proposed Right-of--way-County Route 512" printed August 2, <br /> 2004 provided to Masteller & Moler, Inc . by Christopher J. Kafer, Jr. P .E . , Indian River County <br /> Engineer. <br /> The Plans shall be amended to incorporate a raised median to allow the County to install <br /> landscaping along the CR 512 corridor between the eastbound and westbound lanes. <br />