Laserfiche WebLink
Addendum #8 <br /> Rev. 04/07/05 <br /> Page 2 of 6 <br /> L ADDITIONAL SERVICES IN CONNECTION WITH THE FOLLOWING <br /> CONSTRUCTION PLAN PREPARATION SERVICES : <br /> Task A — Soils_ Investigation: Environmental Assessment and Land Surveying Updates <br /> Additional soils investigation; environmental assessments ; and land surveying shall be <br /> completed along the portion of the Project where the proposed alignment of the roadway will be <br /> modified from its original design as depicted on "Overall Exhibit of Proposed Right-of-way- <br /> County Route 512" printed August 2, 2004 provided to Masteller & Moler, Inc . by Christopher J. <br /> Kafer, Jr. P . E. , Indian River County Engineer. <br /> Soils Investigation : A Soils Investigation will be completed to support the new roadway <br /> alignment consisting of the following Scope of Services : <br /> Field Services <br /> Mobilization <br /> Auger Borings (20) @ 6 ' deep <br /> Muck Probing 2 Man Crew — One Day <br /> Laboratory Services <br /> 1 . Sewer Analysis (8) <br /> 2 . Moisture Content (8) <br /> 3 . Organic Content <br /> Soils Report — The Results of the field investigations and laboratory services will be <br /> compiled within a Soils Report for use in design of the Project Roadway Improvments . <br /> Environmental Assessment : The Environmental Assessment shall include the scope of services <br /> as described in the attached Sub-consultant proposal from Environmental Services, Inc . (ESI) <br /> September 23 , 2004 ; Tasks 1 -5 . <br /> Land Surveying : The Land Surveying shall be performed by Masteller, Moler & Reed, Inc. and <br /> provided to us by Indian River County. The fee for surveying services is not included in this <br /> proposal . The surveying services should include an updated route survey between approximately <br /> Station 64+00 (Phase IV) and Station 264+00 (Phase III) to support the new roadway alignment . <br /> Additional wetlands flagged by the project ' s Environmental Consultant under this Addendum <br /> should be field located as part of this scope. In addition, soil borings obtained under this <br /> Addendum should be field located both horizontally and vertically as part of this scope. <br /> We propose to perform the Scope of Services outlined under Task A for the following lump sum <br /> fees : <br /> Soils Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . $ 8, 464 . 00 <br /> Environmental Assessment (ESI Tasks 1 -5) . . , . . . . . . . . . . . . . . . . $ 7, 475 . 00 <br /> Land Surveying . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . $ (Not Included) <br />