My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-184
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2016 12:31:37 PM
Creation date
9/30/2015 8:48:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/24/2005
Control Number
2005-184
Agenda Item Number
11.I.4
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Services for Improvements to Oslo Road
Area
Oslo Road widening between 43rd and 27th. Avenue
Supplemental fields
SmeadsoftID
4963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> D . The COUNTY shall make provisions for the ENGINEER to enter upon public and private <br /> property as required for the ENGINEER to perform his services . <br /> E . The COUNTY will promptly execute all permit applications and provide application and <br /> review fees necessary to expedite the acquisition of any local , state or federal permits <br /> made necessary by the project . <br /> F . The COUNTY shall provide all right-of-way maps, parcel sketches, legal descriptions, and <br /> abstracts of title for each parcel necessary for the contemplated construction . <br /> SECTION III - SCOPE OF SERVICES <br /> The ENGINEER agrees to perform professional roadway design and related services in connection <br /> with the project as required and set forth in the following: <br /> A. General <br /> 1 . The ENGINEER will endeavor not to duplicate any previous work done on the <br /> project. After issuance of written authorization to proceed, the ENGINEER shall <br /> consult with the COUNTY to clarify and define the COUNTY'S requirements for <br /> the project and review available data. <br /> 2 . The ENGINEER will attend conferences with the COUNTY and its <br /> representatives upon reasonable request. <br /> 3 . In order to accomplish the work described under this Agreement in the time <br /> frames and conditions set forth in this Agreement, the ENGINEER will observe <br /> the following requirements : <br /> a . The ENGINEER will complete his work on the project within the time <br /> allowed by maintaining an adequate staff of registered engineers, <br /> draftsmen, and other employees on the work. <br /> b . The ENGINEER will design the project in such a manner as to be in <br /> reasonable conformance with applicable federal , state and local laws, and <br /> shall comply with the Florida Department of Transportation's Manual on <br /> Uniform Minimum Standards for the Design, Construction, and <br /> Maintenance of Streets and Highways (Green Book), latest edition . <br /> C . The ENGINEER will prepare all necessary sketches and completed <br /> application forms to accompany the COUNTY'S applications for required <br /> federal , state, or local permits. <br /> d . The ENGINEER will cooperate with the COUNTY in order that all <br /> phases of the work may be properly scheduled and coordinated . <br /> e . The ENGINEER will send a complete preliminary set of construction <br /> plans to any city, county, state or federal regulatory agency from which a <br /> permit or other approval is required prior to final approval of the design <br /> by the Director of the Public Works Department, and will coordinate the <br /> project design with all applicable agencies . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.