My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-184
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2016 12:31:37 PM
Creation date
9/30/2015 8:48:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/24/2005
Control Number
2005-184
Agenda Item Number
11.I.4
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Services for Improvements to Oslo Road
Area
Oslo Road widening between 43rd and 27th. Avenue
Supplemental fields
SmeadsoftID
4963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. The ENGINEER will contact all known utility companies having <br /> installations in the immediate vicinity of the proposed work and consider <br /> relocation of utilities, if necessary. The ENGINEER will provide the <br /> COUNTY with necessary information relative to required utility <br /> adjustments, relocations and installations and will show all known <br /> existing utilities on the final design plans. <br /> Design modifications to existing COUNTY utility lines, if necessary, will <br /> be negotiated by a separate agreement with the County Utility <br /> Department, or the County Utilities Department may design modifications <br /> with Utility Department Staff or other consultants . <br /> g. The ENGINEER shall report the status of this project to the Director of <br /> the Public Works Department upon request and hold all drawings, <br /> calculations and related work open to the inspection of the Director or his <br /> authorized agent at any time, upon reasonable request. <br /> 4 . The ENGINEER will furnish copies of the drawings, specifications and contract <br /> documents as required by the COUNTY for material suppliers, federal , state and <br /> local agencies from whom approval of the project must be obtained. Upon <br /> bidding of the construction contract, the ENGINEER will furnish to the <br /> COUNTY 11 " x 17 " originals of the drawings and copies of the specifications for <br /> the COUNTY to copy for prospective bidders. Additional copies beyond those <br /> identified will be provided at cost. All original documents, survey notes, field <br /> books, tracings, and the like including all items furnished to the ENGINEER by <br /> the COUNTY pursuant to this Agreement, are and shall remain the property of the <br /> COUNTY. <br /> 5 . The drawings prepared by the ENGINEER will be of sufficient detail to permit <br /> the actual location of the proposed improvements . Negotiation for all land rights <br /> shall be accomplished by the COUNTY, unless the COUNTY requests the <br /> ENGINEER to perform these services in a subsequent work order to this <br /> AGREEMENT. In this event, the ENGINEER shall be compensated for such <br /> additional services in accordance with Section VI of this AGREEMENT. <br /> 6 . The ENGINEER acknowledges that preparation of applicable permits for the <br /> COUNTY'S submittal through governmental regulatory agencies is included <br /> within the scope of basic compensation for this Agreement. Any additional work <br /> required by regulatory agencies pursuant to regulations established after the date <br /> of this Agreement shall be an additional service and the COUNTY shall <br /> compensate the ENGINEER in accordance with SECTION VI - Additional Work, <br /> of this Agreement and in accordance with the fee schedule in this Agreement, as <br /> approved by the COUNTY prior to commencement of any work performed. <br /> 7 . If following execution of this Agreement the COUNTY proposes to construct the <br /> improvements in a revised phased manner which requires the preparation of plans <br /> or the need to obtain or modify permits previously obtained, the ENGINEER will <br /> be compensated for this effort in accordance with the approved fee schedule in a <br /> subsequent work order to this Agreement . No such additional work shall be <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.