Laserfiche WebLink
initiated unless approved by the Indian River County Board of County <br /> Commissioners . <br /> 8 . Compensation to the ENGINEER for basic services shall be in accordance with <br /> Section V — Compensation, of this Agreement, as mutually agreed upon by the <br /> ENGINEER and COUNTY . <br /> B . Design Survey <br /> The ENGINEER shall provide design survey services necessary to support and facilitate <br /> contemplated design and permitting activities associated with this project . This task will <br /> consist of the preparation of digital base map topographic surveys in accordance with the <br /> intent of the Florida Minimum Technical Standards set forth by the Florida Board of <br /> Professional Land Surveyors in Chapter 61G17-6, Florida Administrative Code, pursuant <br /> to Section 472 . 027 , Florida Statutes . <br /> 1 . Establish a project wide Horizontal Control Network for each project location <br /> within the DESIGN LIMITS . <br /> 2 . Establishment of a project wide Vertical Control Network for each project <br /> location within the DESIGN LIMITS . All elevations will be referenced to NGVD <br /> 1929 datum. <br /> 3 . Field establishment and monumentation of survey baselines to control future <br /> construction . The DESIGN LIMITS for the project location is as follows : <br /> The DESIGN LIMITS shall begin at a point on Oslo Road that is 50 ' east of 43rd <br /> Avenue and continue east on Oslo Road to a point that is 100 ' east of 27t" <br /> Avenue . 27"' Avenue will be surveyed 1500 ' north and 1500 ' south of Oslo <br /> Road. <br /> The survey will include the location of above ground improvements and trees 6" <br /> diameter and greater at breast height, lying within the right-of-way of Oslo Road, <br /> and 27`x' Avenue . Surface evidence of underground utilities will be located . Cross- <br /> section elevations will be obtained at 100 ' intervals and visible high and low areas <br /> and extend across the right of way and 25 ' minimum outside the right of way. <br /> Drainage structures will be located and rim/invert elevations obtained . If a <br /> structure is inaccessible or the drainage pipes are recessed, an elevation on the <br /> bottom of the structure will determined. <br /> 4 . Improvements within the DESIGN LIMITS for each location will include above <br /> ground visible improvements such as existing pavement location, curbing, utilities <br /> (above ground locations only), drainage facilities (where accessible) , sidewalks, <br /> fences, signage and guardrails within the right-of-way. <br /> 5 . Final output will be in the form of a digital AutoCAD , release 20041 DWG file. <br /> All surveying will conform to the minimum technical standards set forth by the <br /> Florida Board of Professional Land Surveyors in Chapter 61G17-6, Florida <br /> Administrative Code , pursuant to Section 472 . 027 , Florida Statutes . <br /> 6 . Research and analysis of existing right of way information (to include Abstracts or <br /> 4 <br />