My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-344
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 10:01:08 AM
Creation date
10/1/2015 12:46:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/21/2008
Control Number
2008-344
Agenda Item Number
12.J.1
Entity Name
Masteller & Moler
Subject
Work Order No.13 Reuse Master Plan Implementation
Area
North County WWTP Site Wabasso
Supplemental fields
SmeadsoftID
7662
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File #0831 <br /> September 19 , 2008 <br /> NOWEXCLUSSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> EXHIBIT 1 <br /> Project Description <br /> Masteller & Moler, Inc. is pleased to provide you with this proposal for providing civil engineering <br /> services related to improvements to be made to Indian River County's Reuse Water System . <br /> These improvements will allow for Indian River County to direct reuse water to the Orchid Isle <br /> and Windsor communities . <br /> As a result of the above described goals, we have developed the following scope of work to be <br /> implemented to expand and improve the overall reuse water system : <br /> • Scope of Services <br /> 1. DESIGN SERVICES <br /> Task A — Reuse Main Improvements — Under this Task we shall develop designs for: 1 ) <br /> conversion of existing brine, potable water and wastewater mains into reuse water mains <br /> and 2) construction of new reuse main improvements . Specifically, the following mains will <br /> be converted into reuse mains: <br /> 1 Conversions of Existing Mains into Reuse Mains <br /> a . The existing 16" brine main starting at the North County WWTP Site extending <br /> eastward along 77th Street and ending at the west side of the Indian River at CR 510 . <br /> b . The existing 12" force main on CR 510 starting at the west side of the Indian River <br /> and extending eastward across the Wabasso Causeway and bridge to approximately <br /> Jungle Trail <br /> c. The existing 12" potable water main on CR 510 starting at the west side of the Indian <br /> River and extending eastward across the Wabasso Causeway to just east of the east <br /> end of the bridge over the Inter Coastal Waterway. <br /> We shall design piping , fittings and valve improvements to allow for connection to and <br /> conversion of the existing brine line; force main and potable water main systems into reuse <br /> water mains . For these sections of proposed pipe conversions, we will conduct site visit(s) ; <br /> prepare plans , specifications and bid documents to describe the requirements for <br /> conversion of the subject piping into reuse mains including : cleaning , disinfecting , leak <br /> detection , valve checking , and hydrostatic testing . <br />
The URL can be used to link to this page
Your browser does not support the video tag.