Laserfiche WebLink
Our File #0831 <br /> September 19 , 2008 <br /> NOWEXCLUSSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> EXHIBIT 1 <br /> Project Description <br /> Masteller & Moler, Inc. is pleased to provide you with this proposal for providing civil engineering <br /> services related to improvements to be made to Indian River County's Reuse Water System . <br /> These improvements will allow for Indian River County to direct reuse water to the Orchid Isle <br /> and Windsor communities . <br /> As a result of the above described goals, we have developed the following scope of work to be <br /> implemented to expand and improve the overall reuse water system : <br /> • Scope of Services <br /> 1. DESIGN SERVICES <br /> Task A — Reuse Main Improvements — Under this Task we shall develop designs for: 1 ) <br /> conversion of existing brine, potable water and wastewater mains into reuse water mains <br /> and 2) construction of new reuse main improvements . Specifically, the following mains will <br /> be converted into reuse mains: <br /> 1 Conversions of Existing Mains into Reuse Mains <br /> a . The existing 16" brine main starting at the North County WWTP Site extending <br /> eastward along 77th Street and ending at the west side of the Indian River at CR 510 . <br /> b . The existing 12" force main on CR 510 starting at the west side of the Indian River <br /> and extending eastward across the Wabasso Causeway and bridge to approximately <br /> Jungle Trail <br /> c. The existing 12" potable water main on CR 510 starting at the west side of the Indian <br /> River and extending eastward across the Wabasso Causeway to just east of the east <br /> end of the bridge over the Inter Coastal Waterway. <br /> We shall design piping , fittings and valve improvements to allow for connection to and <br /> conversion of the existing brine line; force main and potable water main systems into reuse <br /> water mains . For these sections of proposed pipe conversions, we will conduct site visit(s) ; <br /> prepare plans , specifications and bid documents to describe the requirements for <br /> conversion of the subject piping into reuse mains including : cleaning , disinfecting , leak <br /> detection , valve checking , and hydrostatic testing . <br />