Laserfiche WebLink
Exhibit #1 <br />9/19/2008 <br />Page 2 <br />These improvements will allow reuse water to be pumped from the previously designed <br />North WWTP reuse water storage tank and pumping facilities to the Orchid Isle and <br />Windsor barrier island communities. The Storage & Pumping Facilities discharge main will <br />connect to the portion of converted brine to reuse main heading eastward along 77th Street <br />(Hobart Road) to the CR 510 Wabasso Causeway Corridor. At the east terminus of the <br />brine line conversion to reuse at CR 510 at the west side of the Indian River, the converted <br />reuse main will be connected to both a former water main and wastewater main. These <br />former water and wastewater mains will also be converted to be reuse mains as described <br />herein. <br />2 New Reuse Main Improvements <br />As part of this Task, new reuse water mains and appurtenances will be designed to support <br />this project. These reuse main improvements will be extended to serve both the Orchid Isle <br />and Windsor communities. As part of our services, we shall contact by meeting and letter <br />both Orchid Isle and Windsor on behalf of Indian River County to request each community <br />to provide a letter describing their interest in receiving reuse water from Indian River <br />County. <br />Once each community has been informed that the County intends to provide reuse water <br />service, the following reuse main improvements will be designed: <br />a. It is understood that the Orchid Island reuse water main service main exists and <br />extends into said site to its irrigation lake, however, no metering and/or telemetry <br />device exists at this time. This Task will involve the design to allow for installation of <br />a meter, control valve and County standard reuse telemetry system to support <br />allowing Indian River County to deliver reclaimed water to the Orchid Island project. <br />b. 3,300 lineal of 8" reuse main along State Highway A -1-A from the north end an <br />existing 8" main which currently ends near the south line of Windsor; <br />c. 500 lineal feet of 8" reuse main shall be extended from the new 8" reuse main <br />described in d. (above) from the State Highway AAA right-of-way into the Windsor <br />site to an existing lake system. <br />d. This Task will involve the design to allow for installation of a meter, control valve and <br />County standard reuse telemetry system to support allowing Indian River County to <br />deliver reclaimed water to the Windsor project. <br />We shall also provide for electrical engineering design services to support the design for <br />supply of electrical power to the above described facilities. <br />The estimated construction cost for completion of the Task A improvements is <br />$755,500-00. <br />