My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-344
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 10:01:08 AM
Creation date
10/1/2015 12:46:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/21/2008
Control Number
2008-344
Agenda Item Number
12.J.1
Entity Name
Masteller & Moler
Subject
Work Order No.13 Reuse Master Plan Implementation
Area
North County WWTP Site Wabasso
Supplemental fields
SmeadsoftID
7662
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit # 1 <br /> 9/19/2008 <br /> Page 2 <br /> These improvements will allow reuse water to be pumped from the previously designed <br /> North WWTP reuse water storage tank and pumping facilities to the Orchid Isle and <br /> Windsor barrier island communities . The Storage & Pumping Facilities discharge main will <br /> connect to the portion of converted brine to reuse main heading eastward along 77th Street <br /> ( Hobart Road ) to the CR 510 Wabasso Causeway Corridor. At the east terminus of the <br /> brine line conversion to reuse at CR 510 at the west side of the Indian River, the converted <br /> reuse main will be connected to both a former water main and wastewater main . These <br /> former water and wastewater mains will also be converted to be reuse mains as described <br /> herein . <br /> 2 New Reuse Main Improvements <br /> As part of this Task, new reuse water mains and appurtenances will be designed to support <br /> this project. These reuse main improvements will be extended to serve both the Orchid Isle <br /> and Windsor communities . As part of our services , we shall contact by meeting and letter <br /> both Orchid Isle and Windsor on behalf of Indian River County to request each community <br /> to provide a letter describing their interest in receiving reuse water from Indian River <br /> County. <br /> Once each community has been informed that the County intends to provide reuse water <br /> service , the following reuse main improvements will be designed : <br /> a . It is understood that the Orchid Island reuse water main service main exists and <br /> extends into said site to its irrigation lake, however, no metering and/or telemetry <br /> device exists at this time. This Task will involve the design to allow for installation of <br /> a meter, control valve and County standard reuse telemetry system to support <br /> allowing Indian River County to deliver reclaimed water to the Orchid Island project . <br /> b . 3 , 300 lineal of 8" reuse main along State Highway A- 1 -A from the north end an <br /> existing 8" main which currently ends near the south line of Windsor; <br /> c. 500 lineal feet of 8" reuse main shall be extended from the new 8" reuse main <br /> described in d . (above) from the State Highway AAA right-of-way into the Windsor <br /> site to an existing lake system . <br /> d . This Task will involve the design to allow for installation of a meter, control valve and <br /> County standard reuse telemetry system to support allowing Indian River County to <br /> deliver reclaimed water to the Windsor project. <br /> We shall also provide for electrical engineering design services to support the design for <br /> supply of electrical power to the above described facilities . <br /> The estimated construction cost for completion of the Task A improvements is <br /> $755 , 500 - 00 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.