My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-344
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 10:01:08 AM
Creation date
10/1/2015 12:46:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/21/2008
Control Number
2008-344
Agenda Item Number
12.J.1
Entity Name
Masteller & Moler
Subject
Work Order No.13 Reuse Master Plan Implementation
Area
North County WWTP Site Wabasso
Supplemental fields
SmeadsoftID
7662
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File 0831 <br /> September 19 , 2008 <br /> NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> EXHIBIT 2 <br /> Method and Amount of Compensation <br /> Masteller & Molgr, Inc. proposes to provide the Scope of Services described in "Attachment 1 " based on <br /> the following lump sum fees : <br /> L DESIGN SERMES: <br /> Provide for Engineering Design ; Preparation of Specifications & Bid Documents <br /> Utilizing Standard IRC Bid Documents, Forms, Documents & Drawings will be in <br /> electronic Format Acad & MS Word <br /> Fees : Task A ( 1 a , b & c) — Reuse Main Conversions <br /> Engineering Design $ 24 , 520 . 00 <br /> Task A (2a , b , c, & d) — Reuse Main Improvements <br /> Engineering Design $ 28 , 814 . 00 <br /> IL LAND SURVEYING SERVICES $ 16, 300. 00 <br /> Ill. PERMITTING SERVICES $ No Charge <br /> IV. CONSTRUCTION SERVICES: <br /> Assistance during Bidding , Bid Evaluation , Contract Award & Construction <br /> Administration; Periodic Administration and Periodic Construction/Field Observation <br /> Task A ( 1 a , b & c) — Reuse Main Conversions <br /> Construction Services $ 81500 . 00 <br /> Task A (2a , b, c, & d) — Reuse Main Improvements <br /> Construction Services $ 13 , 124. 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.