My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-170
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:37:12 AM
Creation date
9/30/2015 8:47:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/17/2005
Control Number
2005-170
Agenda Item Number
11.I.1
Entity Name
McMahon Associates, Inc.
Subject
Intersection improvements at Cr 510 and US Highway 1 Services Agreement
Supplemental fields
SmeadsoftID
4934
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The ENGINEER will attend biweekly progress meetings, unless the progress meeting can <br /> effectively be attended by conference call . <br /> • The ENGINEER will respond to COUNTY and contractor Request for Information (RFI) to <br /> provide interpretation or clarification of proposed improvements . Repetitive RFI ' s will be <br /> undertaken as an additional service and the fee will be calculated at an hourly rate along with <br /> expenses , unless the RFI was not previously answered clearly . <br /> • The ENGINEER will review and approve contractor submitted shop drawings and material <br /> specification sheets . The shop drawing review allows for two submittals of each shop <br /> drawing . Review of submittals will be undertaken as an additional service and the fee will be <br /> calculated at an hourly rate along with expenses . <br /> • The ENGINEER will review as-built drawings provided by the Contractor ' s licensed <br /> surveyor. <br /> • The ENGINEER will provide the contractor a list of identified deficiencies based upon a final <br /> field review and as-built drawing evaluation . The ENGINEER will perform a final walk <br /> through to verify that identified deficiencies have been rectified . <br /> • At the request of the COUNTY, the ENGINEER will review Contractor proposed plan <br /> alternatives . This work will be undertaken as an additional service and the fee will be <br /> calculated at an hourly rate along with expenses . <br /> J . Certification <br /> The ENGINEER will provide certification to St. Johns River Water Management District and all <br /> other required Federal , State , and local permitting agencies based on As-Built drawings provided <br /> by the Contractor' s licensed surveyor and information provided by the COUNTY . <br /> SECTION IV - TIME FOR COMPLETION <br /> The time for completion of the 90% design drawings, permit applications, and Engineer' s Opinion of <br /> Probable Construction Cost for the four intersections shall be eight ( 8 ) months . Once permits are received, <br /> 100% design drawings shall be completed 90 days thereafter . <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.