My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-170
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:37:12 AM
Creation date
9/30/2015 8:47:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/17/2005
Control Number
2005-170
Agenda Item Number
11.I.1
Entity Name
McMahon Associates, Inc.
Subject
Intersection improvements at Cr 510 and US Highway 1 Services Agreement
Supplemental fields
SmeadsoftID
4934
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
boxes , conduit, interconnect, etc . associated with the improvements at the intersection of <br /> CR-510 and SR- 5 . <br /> 2 . The traffic signal plans shall show all existing equipment to stay and to be removed . <br /> Existing equipment shown on the plans shall be labeled as "to be removed" or "to <br /> remain ." <br /> 3 . Traffic signal plans shall be prepared at a scale of 1 " = 40 ' . <br /> 4 . Video Detection on each end approach, one traffic surveillance camera, and one street <br /> light above each mast arm shall be used on all approaches . <br /> 5 . All mast arm structural calculations for standard MOT mast arms shall be performed and <br /> all (not defined by MOT Standards) resulting data shall be shown on the plans . If <br /> special mast arms design is required it is beyond the scope of this project. In the event a <br /> special mast arm design is required, the ENGINEER shall be compensated for such <br /> additional services in accordance with Section VI of this Agreement . <br /> 6 . A Key sheet and Tabulation of Quantities shall be included exclusively for the <br /> signalization plans . <br /> H . Lighting Plans <br /> Lighting CR-510 is not included in this contract. <br /> A lighting analysis will be completed along US - 1 where roadway widening is proposed. A new <br /> lighting design will be prepared to ensure that the lighting along US- I meets current MOT <br /> criteria. It is assumed that at a minimum, existing light pole relocations will be required . <br /> I . Construction Phase Assistance <br /> The ENGINEER will provide construction phase assistance for the project. The ENGINEER will <br /> act as the COUNTY ' S authorized agent in cooperation with the contractor to achieve the desired <br /> improvements . The ENGINEER will be responsible for periodic construction observation, which <br /> includes but is not limited to the following : <br /> • The ENGINEER will attend a Pre-Bid meeting and respond to contractor questions associated <br /> with the project . <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.