My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-171
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:41:29 AM
Creation date
9/30/2015 8:47:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/17/2005
Control Number
2005-171
Agenda Item Number
11.I.2
Entity Name
McMahon Associates, Inc.
Subject
Intersection Improvements Services Agreement
Area
1st St. SW & 27th Ave., 5th St. SW & 27th Ave. 1st St SW & 43rd
Supplemental fields
SmeadsoftID
4943
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Construction Phase Assistance <br /> The ENGINEER will provide construction phase assistance foT the project . The ENGINEER will <br /> act as the COUNTY ' S authorized agent in cooperation with the contractor to achieve the desired <br /> improvements . The ENGINEER will be responsible for periodic construction observation, which <br /> includes but is not limited to the following : <br /> • The ENGINEER will attend a Pre-Bid meeting and respond to contractor questions associated <br /> with the project. <br /> • The ENGINEER will attend biweekly progress meetings, unless the progress meeting can <br /> effectively be attended by conference call . <br /> • The ENGINEER will respond to COUNTY and contractor Request for Information (RFI) to <br /> provide interpretation or clarification of proposed improvements . Repetitive RFI ' s will be <br /> undertaken as an additional service and the fee will be calculated at an hourly rate along with <br /> expenses, unless the RFI was not previously answered clearly . <br /> • The ENGINEER will review and approve contractor submitted shop drawings and material <br /> specification sheets. The shop drawing review allows for two submittals of each shop <br /> drawing. Review of submittals will be undertaken as an additional service and the fee will be <br /> calculated at an hourly rate along with expenses . <br /> • The ENGINEER will review as-built drawings provided by the Contractor ' s licensed <br /> surveyor. <br /> • The ENGINEER will provide the contractor a list of identified deficiencies based upon a final <br /> field review and as-built drawing evaluation. The ENGINEER will perform a final walk <br /> through to verify that identified deficiencies have been rectified . <br /> • At the request of the COUNTY, the ENGINEER will review Contractor proposed plan <br /> alternatives . This work will be undertaken as an additional service and the fee will be <br /> calculated at an hourly rate along with expenses . <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.