Laserfiche WebLink
I . Certification <br /> The ENGINEER will provide certification to St. Johns River Water Management District and all <br /> other required Federal, State , and local permitting agencies based on As-Built drawings provided <br /> by the Contractor ' s licensed surveyor and information provided by the COUNTY . <br /> SECTION IV - TIME FOR COMPLETION <br /> The time for completion of the 90% design drawings, permit applications, and Engineer's Opinion of <br /> Probable Construction Cost for the four intersections shall be eight (8 ) months . Once permits are received, <br /> 100% design drawings shall be completed 90 days thereafter. <br /> SECTION V - COMPENSATION <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this <br /> Agreement fees in accordance with the following : <br /> A . Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the COUNTY <br /> follows : <br /> Task Fee <br /> Lump Sum Components <br /> Design Survey $61 , 888 <br /> Roadway Design $ 171 , 806 <br /> Signing and Pavement Marking Design $413476 <br /> Traffic Signal Design $323472 <br /> Storm Water Design & Permitting $ 33 062 <br /> Utility Coordination $ 8 , 118 <br /> Geotechnical $28774 <br /> Hourly Rate Components Feel <br /> Utility Location Survey $20, 000 <br /> Construction Phase Assistance $20, 000 <br /> Right of Way Maps , Parcel Sketches , and Legal Descriptions $20 , 000 <br /> All Fees provided for Hourly Rate Components may need to be supplemented for additional <br /> compensation based upon project specific needs . <br /> 14 <br />