ARTICLE 1 GENERAL PROVISIONS <br /> § 1 .1 RELATIONSHIP OF PARTIES <br /> The Construction Manager accepts the fiduciary relationship of trust and confidence hereby established with the <br /> Owner by this Agreement, and covenants with the Owner to furnish the Construction Manager' s reasenabke best <br /> skill and judgment and to cooperate with the Architect in furthering the interests of the Owner. The Construction <br /> Manager shall furnish construction administration and management services and use the Construction Manager' s <br /> best efforts to perform the Project in an expeditious and economical manner consistent with the interests of the <br /> Owner. The Owner shall endeavor to promote harmony and cooperation among the Owner, Architect, Construction <br /> Manager and other persons or entities employed by the Owner for the Project. <br /> § 1 .2 GENERAL CONDITIONS <br /> For the Construction Phase, the General Conditions of the contract shall be the AIA® Document A201TM- 1997 , <br /> General Conditions of the Contract for Construction, as modified, which is attached and incorporated herein by <br /> reference. For the Preconstruction Phase, or in the event that the Preconstruction and Construction Phases proceed <br /> concurrently, A201TM 1997 A201TM- 1997, as modified, shall apply to the Preconstruction Phase only as <br /> specifically provided in this Agreement. The term " Contractor" as used in A291TM��A201TM- 1997 , as <br /> modified, shall mean the Construction Manager. <br /> ARTICLE 2 CONSTRUCTION MANAGER' S RESPONSIBILITIES <br /> The Construction Manager shall perform the services described in this Article . The services to be provided under <br /> Sections 2. 1 and 2 .2 constitute the Preconstruction Phase services . If the Owner and Construction Manager agree, <br /> after consultation with the Architect, the Construction Phase may commence before the Preconstruction Phase is <br /> completed, in which case both phases will proceed concurrently. <br /> § 2. 1 PRECONSTRUCTION PHASE <br /> § 2. 1 . 1 PRELIMINARY EVALUATION <br /> The Construction Manager shall provide a preliminary evaluation of the Owner ' s pr-egf fn and Project budget <br /> �� ' eh in terf , of4h edief requirements . <br /> § 2.1 .2 CONSULTATION <br /> The Construction Manager with the Architect shall jointly schedule and attend regular meetings with the Owner. <br /> The Construction Manager shall consult with the Owner and Architect regarding site use and improvements and the <br /> selection of materials, building systems and equipment . The Construction Manager shall provide recommendations <br /> on construction feasibility ; actions designed to minimize adverse effects of labor or material shortages ; time <br /> requirements for procurement, installation and construction completion ; and factors related to construction cost, <br /> including estimates of alternative designs or materials, preliminary budgets and possible economies . <br /> § 2. 1 . 3 PRELIMINARY PROJECT SCHEDULE <br /> When Project requirements described in Section 3 . 1 . t have been sufficiently identified, the Construction Manager <br /> shall prepare, and periodically update, a preliminary Project schedule for the Architect ' s review and the Owner' s <br /> approval. The Construction Manager shall obtain the Architect ' s and Owner' s approval of the portion of the <br /> preliminary Project schedule relating to the performance of the Architect' s services . The Construction Manager shall <br /> coordinate and integrate the preliminary Project schedule with the services and activities of the Owner, Architect <br /> and Construction Manager. As design proceeds, the preliminary Project schedule shall be updated to indicate <br /> proposed activity sequences and durations , milestone dates for receipt and approval of pertinent information, <br /> submittal of a Guaranteed Maximum Price proposal , preparation and processing of shop drawings and samples, <br /> delivery of materials or equipment requiring long-lead-time procurement, Owner' s occupancy requirements showing <br /> portions of the Project having occupancy priority, and proposed date of Substantial Completion . If preliminary <br /> Project schedule updates indicate that previously approved schedules may not be met, the Construction Manager <br /> shall make appropriate recommendations to the Owner and Architect. <br /> § 2 . 1 .4 PHASED CONSTRUCTION <br /> The Construction Manager shall make recommendations to the Owner and Architect regarding the phased issuance <br /> of Drawings and Specifications to facilitate phased construction of the Work, if such phased construction is <br /> appropriate for the Project, taking into consideration such factors as economies , time of performance , availability of <br /> labor and materials , and provisions for temporary facilities . <br /> AIA Document A121 TMCMc — 2003 and AGC Document 565. Copyright © 1991 and 2003 by The American Institute of Architects and The Associated <br /> General Contractors of America. All rights reserved. WARNING : This document Is protected by U.S. Copyright Law and International Treaties. 3 <br /> Unauthorized reproduction or distribution of this document, or any portion of it, may result In severe civil and criminal penalties, and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 17 :00 :26 on 05/25/2005 under Order <br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale. <br /> User Notes : (3163795107) <br />