Laserfiche WebLink
5 .3 Paragraphs 5. 1 and 5.2 do not apply to construction services work purchased by the <br /> County as OWNER which are paid for, in whole or in part, with federal funds and are <br /> subject to federal grantor laws and regulations or requirements that are contrary to any <br /> provision of the Local Government Prompt Payment Act. In such event, payment and <br /> retainage provisions shall be governed by the applicable grant requirements and <br /> guidelines. <br /> 5. 4 ACCEPTANCE AND FINAL PAYMENT: Upon receipt of written notice that the work is <br /> ready for final inspection and acceptance , the ENGINEER will promptly make such <br /> inspection and when the ENGINEER finds the work acceptable under the terms of the <br /> Contract and the Contract fully performed , the ENGINEER will promptly issue a final <br /> completion certificate stating that the work provided for in this Contract has been <br /> completed , and acceptance by the OWNER under the terms and the conditions thereof <br /> is recommended and the entire balance found to be due the CONTRACTOR , will be <br /> paid to the CONTRACTOR by the OWNER following County Commission approval of <br /> the final Contract payment. <br /> 5 . 5 Acceptance of Final Payment as Release. The acceptance by the CONTRACTOR of <br /> final payment shall be and shall operate as a release to the OWNER from all claims and <br /> all liability to the CONTRACTOR other than claims in stated amounts as may be <br /> specifically excepted by the CONTRACTOR for all things done or furnished in <br /> connection with the work under this Contract and for every act and neglect of the <br /> OWNER and others relating to or arising out of the work . Any payment, however, final or <br /> otherwise , shall not release the CONTRACTOR or its sureties from any obligations <br /> under the Contract Documents or the Payment and Performance Bonds . <br /> ARTICLE 6 INTEREST <br /> Not Applicable. <br /> ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br /> In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br /> representations: <br /> 7 . 1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents, work, site, locality, and all local conditions and laws and regulations that in <br /> any manner may affect cost, progress , performance or furnishing of the work. <br /> 7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> conditions and drawings of physical conditions which are identified in the Supplementary <br /> Conditions as provided in Paragraph 4.02 of the General Conditions, and accepts the <br /> determination set forth in Paragraph SC-4.02 of the Supplementary Conditions of the <br /> extent of the technical data contained in such reports and drawings upon which <br /> CONTRACTOR is entitled to rely. <br /> 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying) all such examinations, investigations , explorations, tests, <br /> 00530-4 <br /> HTrojects\0649\121idding Contract Specifications\Spec TemplateM07=530Wgreennent between Owner Contractor Rev. <br /> 012507.doc <br />