Laserfiche WebLink
reports and studies (in addition to or to supplement those referred to in Paragraph 7.2 <br /> above) which pertain to the subsurface or physical conditions at or contiguous to the site <br /> or otherwise may affect the cost, progress, performance or furnishing of the work as <br /> CONTRACTOR considers necessary for the performance of furnishing of the work at the <br /> Contract Price, within the Contract Time and in accordance with the other terms and <br /> conditions of the Contract Documents, including specifically the provisions of Paragraph <br /> 4.02 of the General Conditions; and no additional examinations, investigations , <br /> explorations, tests, reports , studies or similar information or data are or will be required by <br /> CONTRACTOR for such purposes. <br /> 7 .4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br /> the Contract Documents with respect to existing underground facilities at or contiguous to <br /> the site and assumes responsibility for the accurate location of said underground facilities. <br /> No additional examinations, investigations, explorations, tests, reports , studies or similar <br /> information or data in respect of said underground facilities are or will be required by <br /> CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4.04 of the General <br /> Conditions. <br /> 7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br /> investigations, explorations, tests, reports and studies with the terms and conditions of the <br /> Contract Documents . <br /> 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts , errors or <br /> discrepancies that he has discovered in the Contract Documents and the written resolution <br /> thereof by ENGINEER is acceptable to CONTRACTOR. <br /> ARTICLE 8 CONTRACT DOCUMENTS. <br /> The Contract Documents which comprise the entire agreement between OWNER and <br /> CONTRACTOR concerning the work consist of the following: <br /> 8. 1 This Agreement (Section 00530) . <br /> 8.2 Performance and Payment Bonds (Sections 00610 and 00612) . <br /> 8 .3 Notice of Award and Notice to Proceed (examples in Section 00800). <br /> 8.4 General Conditions (Section 00700) . <br /> 8.5 Supplementary Conditions (Section 00800) . <br /> 8.6 Specifications bearing the title "CR 510 Force Main" as listed in the table of contents <br /> hereof. <br /> 8.7 Drawings , inclusive with each sheet bearing the following general title "CR510 Force Main" <br /> 8. 8 Addenda numbers 1 to 1 , inclusive. <br /> 00530-5 <br /> H\Projects\0649\13idding Contract Specifications\Spec Tempfate\2007\00530\Agreement between Owner Contractor Rev. <br /> 012507.doc <br />