My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-063
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:21:16 AM
Creation date
9/30/2015 10:36:21 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 5. PAYMENT PROCEDURES. <br />CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the <br />General Conditions. Applications for Payment will be processed by ENGINEER as <br />provided in the General Conditions. <br />5.1 Progress Payments. OWNER shall make progress payments on account of the <br />Contract Price on the basis of CONTRACTOR'S Applications for Payment as <br />recommended by ENGINEER, on or about the 30th day of each month during <br />construction as provided below. All progress payments will be on the basis of the <br />progress of the work measured by the schedule of values established in Paragraph <br />2.07 of the General Conditions (and in the case of Unit Price Work based on the <br />number of units completed), or, in the event there is no schedule of values, as <br />provided in the General Requirements. <br />5.2 Final payment. Upon final completion and acceptance of the work in accordance <br />with Paragraph 14.07 of the General Conditions, OWNER shall pay the remainder <br />of the Contract Price as recommended by ENGINEER as provided in said <br />Paragraph 14.07. <br />ARTICLE 6. INTEREST. <br />Not Applicable. <br />ARTICLE 7. CONTRACTOR'S REPRESENTATIONS. <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />representations: <br />7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br />Documents, work, site, locality, and all local conditions and laws and regulations <br />that in any manner may affect cost, progress, performance or furnishing of the <br />work. <br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of <br />subsurface conditions and drawings of physical conditions which are identified in <br />the Supplementary Conditions as provided in Paragraph 4.02 of the General <br />Conditions, and accepts the determination set forth in Paragraph SC -4.02 of the <br />Supplementary Conditions of the extent of the technical data contained in such <br />reports and drawings upon which CONTRACTOR is entitled to rely. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />obtaining and carefully studying) all such examinations, investigations, <br />explorations, tests, reports and studies (in addition to or to supplement those <br />referred to in Paragraph 7.2 above) which pertain to the subsurface or physical <br />conditions at or contiguous to the site or otherwise may affect the cost, progress, <br />performance or furnishing of the work as CONTRACTOR considers necessary for <br />the performance of furnishing of the work at the Contract Price, within the Contract <br />Time and in accordance with the other terms and conditions of the Contract <br />044572007 <br />00530-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.