My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-063
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:21:16 AM
Creation date
9/30/2015 10:36:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/13/2007
Control Number
2007-063
Agenda Item Number
11.J.2
Entity Name
SPS Contracting, Inc. of Vero Beach
Subject
Force Main West Wastewater Transmission Phase II
Bid Number
2007-029
Supplemental fields
SmeadsoftID
6136
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents, including specifically the provisions of Paragraph 4.02 of the General <br />Conditions; and no additional examinations, investigations, explorations, tests, <br />reports, studies or similar information or data are or will be required by <br />CONTRACTOR for such purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or <br />indicated on the Contract Documents with respect to existing underground facilities <br />at or contiguous to the site and assumes responsibility for the accurate location of <br />said underground facilities. No additional examinations, investigations, <br />explorations, tests, reports, studies or similar information or data in respect of said <br />underground facilities are or will be required by CONTRACTOR in order to perform <br />and furnish the work at the Contract Price, within the Contract Time and in <br />accordance with the other terms and conditions of the Contract Documents, <br />including specifically the provisions of Paragraph 4.03 of the General Conditions. <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and <br />conditions of the Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br />discrepancies that he has is covered in the Contract Documents and the written <br />resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />ARTICLE 8. CONTRACT DOCUMENTS. <br />The Contract Documents which <br />comprise the <br />entire <br />agreement between OWNER and <br />CONTRACTOR concerning the <br />work consist <br />of the <br />following: <br />8.1 This Agreement (Section 00530). <br />8.2 Performance and other bonds (Sections 00610 and 00620). <br />8.3 Notice of Award and Notice to Proceed. <br />8.4 General Conditions (Section 00700). <br />8.5 Supplementary Conditions (Section 00800). <br />8.6 Technical Specifications as listed herein the table of contents of these documents. <br />8.7 Drawings consisting of a coversheet and sheets 2 through 17, inclusive, with each <br />bearing the title INDIAN RIVER SUBAQUEOUS UTILITY CROSSINGS ALONG <br />C.R. 510 BRIDGES. <br />8.8 Addenda numbers 1 to 5 , inclusive. <br />8.9 CONTRACTOR'S Bid Form (Section 00310). <br />8.10 The following, which may be delivered or issued after the effective date of the <br />Agreement and are not attached hereto: All written amendments and other <br />044572007 <br />00530-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.