My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-380
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 1:57:36 PM
Creation date
9/30/2015 9:26:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/15/2005
Control Number
2005-380
Agenda Item Number
11.I.1
Entity Name
Stanley Consultants, Inc.
Subject
Final Design and Plans Services
Area
CR 510 from CR 512 to east of 75th. Court
Supplemental fields
SmeadsoftID
5287
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> be designed and constructed by others or added by amendment, if required . ENGINEER shall <br /> coordinate with the Developer ' s Engineer. <br /> • Design the intersection of 89th Street at 91St Street to connect Sebastian River High School with 89th <br /> Street, including approximately 100 linear feet north of 89th Street over the canal and including design <br /> of a new box culvert at the canal . <br /> • Coordination with the IRC School Board to close Hammerhead Way, if required . The high school ' s <br /> internal road will remain . <br /> • Design a new 91St Avenue roadway from 89`h Street to 87"' Street as a two lane rural typical section , <br /> approximately 1400 linear feet . <br /> 0 Design left turn lanes at 91St Avenue and 87th Street, which requires 800 linear feet of widening on <br /> 87`h Street from west of 91St Avenue to CR 510 for new left turn lanes. Requires 200 linear feet of <br /> widening on 91st Avenue just south of 87`h Street. <br /> • Design proposed intersection at 82nd Avenue for a distance of 100 feet north and south of CR 510 and <br /> coordinate with FDOT ' s Consultant designing 82nd Avenue . <br /> • Design three new bridge structures (CR 510 over Lateral "D " Canal at curve, CR 510 over Lateral <br /> "C " Canal ( 82nd Ave) at Station 149+00 , and CR 510 over Lateral "L" Canal (near 79th Terrace) at <br /> Station 174+80) . <br /> • Design modification to one existing bridge structure (Vero Lakes Estates access Road over Lateral <br /> "D " Canal) . <br /> • Design three new box culverts (CR 510 over local high school (89th St) canal near Station 69+00 , 91 st <br /> Avenue over local high school (89"' St) canal, and CR 510 drainage structure, near Station 179+40) . <br /> Design updates, which may be added by work order, will be required when changes in field conditions occur <br /> or when other roadway resurfacing or widening projects are constructed after the notice to proceed. <br /> SECTION II - COUNTY OBLIGATIONS <br /> The COUNTY agrees to provide (in a timely manner) the following material , data, or services as <br /> required in connection with the work to be performed under this Agreement ; all of which information the <br /> ENGINEER may use and reasonably rely upon : <br /> A. Provide the ENGINEER with a copy of all previously conducted studies , geotechnical <br /> investigations, traffic counts, preliminary data or reports available , existing location surveys, <br /> topographic surveys , and related documents including Vero Lake Estates aerial/Topo Maps <br /> and Master Drainage Plan. <br /> B . Provide the ENGINEER with all available drawings, right-of-way maps , and other documents <br /> in the possession of the COUNTY pertinent to the project . <br /> Page 2 of 16 <br /> CR 510 Design Agreement20051104.doc November 7, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.