My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-380
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 1:57:36 PM
Creation date
9/30/2015 9:26:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/15/2005
Control Number
2005-380
Agenda Item Number
11.I.1
Entity Name
Stanley Consultants, Inc.
Subject
Final Design and Plans Services
Area
CR 510 from CR 512 to east of 75th. Court
Supplemental fields
SmeadsoftID
5287
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
federal, state , or local permits . <br /> d . The ENGINEER will cooperate with the COUNTY in order that all phases <br /> of the work may be properly scheduled and coordinated. <br /> e . The ENGINEER will send a complete preliminary set of construction plans <br /> to any city (including City of Sebastian) , county, state , regional, or federal <br /> regulatory agency from which a permit or other approval is required prior to <br /> final approval of the design by the Director of the Public Works Department, <br /> and will coordinate the project design with all applicable agencies . <br /> f. The ENGINEER will contact all known utility companies having installations in <br /> the immediate vicinity of the proposed work and consider relocation of utilities , <br /> if necessary. The ENGINEER will provide the COUNTY with necessary <br /> information relative to required utility adjustments, relocations and installations <br /> and will show all known existing utilities on the final design plans . All bridges <br /> and structures will be designed with adequate utility line chases and/or shelves . <br /> Design modifications to existing COUNTY utility lines , if necessary, may be <br /> negotiated by a separate agreement with the County Utility Department, or the <br /> County Utilities Department may design modifications with Utility Department <br /> Staff or other consultants . <br /> g . The ENGINEER shall report the status of this project to the Director of the <br /> Public Works Department upon request and hold all drawings , calculations and <br /> related work open to the inspection of the Director or his authorized agent at any <br /> time , upon reasonable request . <br /> 4 . The ENGINEER will furnish copies of the drawings, specifications and contract <br /> documents as required by the COUNTY for material suppliers , federal , state and local <br /> agencies from whom approval of the project must be obtained . Upon bidding of the <br /> construction contract, the ENGINEER will furnish to the COUNTY 11 " x 17 " originals <br /> of the drawings and copies of the specifications for the COUNTY to copy for <br /> prospective bidders . Additional copies beyond those identified will be provided at cost. <br /> All original documents, survey notes , field books, tracings , and the like including all <br /> items furnished to the ENGINEER by the COUNTY pursuant to this Agreement, are <br /> and shall remain the property of the COUNTY . <br /> 5 . The drawings prepared by the ENGINEER will be of sufficient detail to permit the <br /> actual location of the proposed improvements . Negotiation for all land rights shall be <br /> accomplished by the COUNTY, unless the COUNTY requests the ENGINEER to <br /> perform these services in a subsequent work order to this AGREEMENT . In this <br /> event, the ENGINEER shall be compensated for such additional services in <br /> accordance with Section VI of this AGREEMENT . <br /> 6 , The ENGINEER acknowledges that preparation of applicable permits for the <br /> COUNTY'S submittal through governmental regulatory agencies and FS 298 Water <br /> Control Districts is included within the scope of basic compensation for this Agreement. <br /> The COUNTY has acquired a conceptual SJRWMD permit for the Vero Lakes Estates <br /> Subdivision which includes local road paving. Two FS 298 Water Control Districts , <br /> Sebastian River Water Control District and Vero Lake Estates Water Control District, <br /> Page 4 of 16 <br /> CR 510 Design Agreemem20051104.doc November 7 , 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.